Factory direct through a dealer: how buying plant equipment this way works
Reviewed November 8, 2026. Official sources are linked where they exist.
Short answer
A factory-direct dealer sells equipment made by the factory and shipped from it to your dock, without a warehouse distributor in between. The dealer's job is the part the factory does not do for a single plant: turn a photo, a floor plan, or a drawing set into one quotation that lists every component, with drawings and a bill of material before the purchase order, freight to the dock, and installation as its own line when you want it. You get factory lead times and pricing on each family, and one place to ask questions across offices, mezzanines, guardrail, dock equipment, and doors.
What "factory direct" means here
The equipment is built to order by the factory and ships from the factory to your site. There is no stocking distributor adding a second margin and a second lead time. The dealer is the factory's representative for your plant: it scopes the job, prices it from the factory's price book, and stays with the order through delivery.
That matters most on engineered equipment, where the order is drawings first. A mezzanine, a modular office, or a dock package is built from dimensions; the quotation has to be right before anything is cut.
What you send and what comes back
Send what you have: a photo of the floor, a sketch with dimensions, a floor plan, or the architect's drawing set. Back comes a quotation where every component is its own line item, the drawings and the bill of material behind it, and the freight to your dock. Where the job needs it, a rendering of the space comes with it so the people who approve the purchase see what they are buying.
- One quotation across equipment families, each line priced
- Drawings and a bill of material before the purchase order
- Freight to the dock or job site included
- Installation quoted as its own line, through the installer network
- PE-stamped drawings as an added line when a permit needs them
When this is the right way to buy
When the purchase is engineered or site-specific, when several families meet on one project (an office on a mezzanine behind guardrail by a dock), and when you want the factory's lead time rather than a distributor's. For small off-the-shelf parts, a catalog is faster; for anything built from dimensions, a quotation from drawings is what keeps change orders off the job.
Equipment like modular offices, mezzanines, and dock equipment often qualifies for first-year expensing under Section 179 and bonus depreciation, which the Section 179 calculator on this site estimates.
Questions buyers ask
- Is factory direct cheaper than buying from a distributor?
- On built-to-order equipment it usually removes a second margin and a stocking step, and it gives you the factory's lead time. The quotation shows each component's price so you can compare line by line.
- Do you install?
- Installation is quoted as its own line through an installer network from the same drawings, or you can use your own contractor with the drawings and bill of material.
- What do I need to send for a quotation?
- Whatever you have: a photo of the floor, a sketch with dimensions, a floor plan, or the drawing set. The quotation comes back with drawings and a bill of material before you place an order.
Do your own research
Official sources first. We link the rule, not a summary of the rule, wherever one exists.
- Publication 946, How to Depreciate Property
IRS
Section 179 and depreciation rules for equipment purchases.