- Do you bid to general contractors or only to owners?
- Both. On a bid project we quote the general contractor or the design-builder for the scopes in the documents. On an owner-furnished package we quote the owner and coordinate dimensions and rough-ins with the contractor.
- Can you quote from the drawings alone?
- Yes. Send the plan set and the specification sections and we take the quantities and sizes from the documents. Where the documents do not give a size or a rating, the quotation says what was assumed.
- Do you provide stamped drawings?
- Non-sealed drawings are included with every quotation and submittal. PE-stamped drawings and calculations for the project's state are quoted as a separate line when the permit office or the specification requires them.
- Is installation included?
- Installation is quoted as its own line when you ask for it, or left to your crews and trades. The quotation states which, and lists what is by others, such as pit forming, electrical connections, and unloading.
- Is freight included?
- Yes. Every quotation includes freight to the job site. Tell us about site access, a dock or ground-level unloading, and any delivery windows.
- Can you substitute for a specified product?
- When the specification allows substitutions we quote the specified basis and list any proposed equal as an alternate, with the data needed for a substitution request. Whether it is accepted is the architect's decision.
- When should the equipment be chosen on a new building?
- During design, before the dock wall and slab are detailed. Dock leveler pits, door openings, mezzanine column loads, and the power to offices and doors are all built into the structure, and changing them after the pour is far more costly than deciding them on paper.
- Should the equipment be in the contractor's scope or bought by the owner?
- Either works. Equipment tied to the structure, such as dock levelers and doors, is usually in the general contract so one party owns the coordination. Offices, guardrail, and furniture are often bought by the owner and installed near the end. We quote it either way and say which items need early decisions.
- What do you need to start?
- The site plan and floor plan, the dock and door schedule if there is one, the clear height, and how the building will be used: trailer mix, forklift types, headcount, and what is stored. A sketch is enough for a first pass.
- Can we see it before we commit?
- For modular offices and rooms we produce a three-dimensional rendering and a drawing set from your plan before the purchase order, so the room is approved on paper first.