Line Item SupplyIndustrial Equipment
Request a Quote

General contractors · design-builders · owners building new

Send the bid set. Get the building and the equipment on one number.

We read the drawings and the specification sections and quote the metal building package, dock equipment, doors, mezzanines, modular offices, guardrail, and furniture, with clarifications in writing and freight to the site included. On a new building it all goes in the drawings, not in a change order.

Isometric drawing of a steel building frame being erected with a crane on site

Representative drawing of the equipment type, not the exact configuration quoted.

From invitation to closeout

How we work with your estimating and project teams

  1. STEP 01

    Send the set

    The drawings and the project manual, or just the sheets and sections that touch our scopes. A bid invitation link works too.

  2. STEP 02

    We take it off

    We read the plans, schedules, and specification sections and return a quotation that lists every item by opening, bay, or room, with freight to the site included.

  3. STEP 03

    Clarifications in writing

    Anything the documents leave open is listed as a clarification or an alternate, so the number you carry matches what the documents ask for.

  4. STEP 04

    Submittals

    After award we issue product data and drawings for the architect's review. Non-sealed drawings are standard; PE-stamped drawings are quoted as an added line.

  5. STEP 05

    Released to the factory

    Approved submittals release the order. Ship dates are confirmed by the factory on the order acknowledgment and tracked against your schedule.

  6. STEP 06

    Delivery and closeout

    Deliveries are scheduled to the site with the unloading requirements stated up front. Operation and maintenance data and warranty documents follow for closeout.

Installation subcontractors

Do you install mezzanines, offices, dock equipment, doors, or metal buildings?

We send installers in our network the jobs in their area with the drawings and the bill of material already done. No fee, no exclusivity, you price each job.

Join the installer network
Cutaway drawing of a clear-span metal building interior with tapered rigid frames and no interior columns

Metal building packages

The shell too: pre-engineered and cold-formed steel buildings.

Rigid-frame buildings for wide spans, cranes, and tall eaves. Cold-formed buildings for shops, storage, and smaller commercial work. Each is engineered to the loads at the job site and ships with the anchor bolt plan, column reactions, and erection drawings. Quoted to the specification, or from a sketch.

Representative drawing of the equipment type, not the exact configuration quoted.

Canopies, walkways, and shelters

The cover over the entrance, the walkway, and the dock.

Entrance canopies, covered walkways, dock canopies, and bike, transit, and smoking shelters, with translucent, metal, or glass roofs on steel or aluminum. Each is engineered for the snow and wind at the job site and quoted from the drawings or a sketch, with installation as a separate line when you want it.

Representative drawing of the equipment type, not the exact configuration quoted.

Isometric drawing of a steel entrance canopy with a grid soffit over a glass entry

New construction

What the building has to know before the slab is poured

Most equipment problems on a new building are coordination problems. A leveler that does not fit its pit, a door with no headroom for its track, a mezzanine column over a slab that was never designed for it. Each one is cheap to fix on a drawing and costly to fix in concrete and steel. Selecting the equipment during design turns them into dimensions on a sheet.

  • Dock leveler pits and embedded steel, formed before the pour
  • Door openings, headroom, and jamb steel, set by the door type
  • Mezzanine column loads, given to the engineer of record
  • Power and data for offices, doors, and dock controls
Cutaway drawing of a new warehouse shell with steel columns, roof joists, and high-bay lights

Representative drawing of the equipment type, not the exact configuration quoted.

Equipment scopes we quote

Where each scope sits, what must be coordinated, and what you get back

Section numbers are where these scopes are commonly written. The project manual governs; send the sections and we quote to them.

Isometric drawing of a row of dock doors with shelters, bumpers, and vehicle restraints on a distribution building

Loading dock equipment

Commonly Section 11 13 00, Loading Dock Equipment

Coordinate before it is built
Leveler pits are formed before the slab is poured. Pit size, the embedded curb angle, and the conduit run to the control panel all come from the leveler's pit drawing, so the equipment has to be selected before the dock wall is formed.
What you get from us
Pit drawings, electrical requirements, product data, and the door-by-door schedule of levelers, seals or shelters, restraints, and bumpers.
See the equipment
Isometric drawing of a building with two insulated sectional overhead doors, a walk door, and bollards

Industrial doors

Commonly Division 08: coiling doors, sectional doors, traffic doors

Coordinate before it is built
Opening width and height, headroom, side room, and the steel at the jambs and header are set by the door type. High-speed and sectional doors need different clearances and different power, so the door schedule should be settled before the wall panels and steel are detailed.
What you get from us
A door schedule by opening, clearance and mounting details, wind-load and cycle data where specified, and power and control requirements.
See the equipment
Isometric drawing of a steel mezzanine with a modular office on the deck, a stair, and a pallet gate

Mezzanines and work platforms

Commonly Division 05 metal fabrications, or Division 13 special construction

Coordinate before it is built
A mezzanine puts concentrated column loads on the slab. The column reactions go to the engineer of record early, so the slab or footings are designed for them instead of being checked after the pour.
What you get from us
Layout and framing drawings, column reactions, deck and load data, stair and guard details. PE-stamped drawings and calculations are an added line when the permit or the specification asks for them.
See the equipment
Isometric drawing of a two-story modular office with a stair and guarded upper deck

Modular offices and rooms

Commonly Division 13, fabricated structures and rooms

Coordinate before it is built
Offices, break rooms, quality labs, and guard booths inside the shell need a power feed, a data path, and clear height under the sprinklers and ductwork. Placing them on the plan early keeps mains and ducts out of the footprint.
What you get from us
Floor plan and elevations, panel and finish data, electrical layout with the connection point, and a three-dimensional rendering of the room for the owner's approval.
See the equipment
Isometric drawing of guardrail, column guards, and bollards along a pallet rack aisle

Guardrail and protection

Commonly Division 05 or Division 10, by product

Coordinate before it is built
Guardrail, bollards, rack protection, and walkway barriers anchor into the finished slab. Laying them out with the traffic plan, before racking and equipment arrive, avoids anchors landing on joints and embedded conduit.
What you get from us
A layout over the floor plan, anchor details, impact ratings where the specification gives one, and a counted bill of material.
See the equipment
Isometric drawing of a benching workstation with privacy screens, monitors, pedestals, and chairs

Plant and office furniture

Commonly Division 12, furniture; wire partitions and lockers in Division 10

Coordinate before it is built
Furniture is last in, but it decides where power and data come out of the floor and walls. A furniture plan during design keeps floor boxes and whips where the desks and benches will stand.
What you get from us
A furniture plan, product data and finishes, and a counted schedule by room.
See the equipment

Photos are representative and are credited on each product family page.

What to send

  • The architectural and structural sheets that show the building, the dock wall, the door schedule, and any platforms or rooms inside the shell
  • The specification sections for the scopes you want quoted, including the substitution requirements
  • The bid date, and whether you want installation or erection quoted or supply only
  • The project state and job site address, for design loads, sales tax, and stamped drawings if they are required
  • Site delivery conditions: dock or ground-level unloading, access limits, and delivery windows

What the quotation says

Every item is listed by opening, bay, or room, so it can be checked against the drawings. The quotation states what is included, what is by others, any clarification or alternate, the drawings included, and freight to the site. Pit forming, embedded steel set in concrete, foundations, electrical connections, and unloading are listed as by others unless you ask for them to be priced.

For owners and developers

Send the site plan and floor plan as soon as there is one. We mark up where the dock positions, doors, platforms, and rooms sit, list the decisions that affect the structure, and return a quotation with freight to the site included. Your architect and engineer get the dimensions and loads they need; your contractor gets a clear line between what is in the general contract and what you are buying yourself.

Equipment tied to the structure usually belongs in the general contract. Offices, guardrail, and furniture are often bought by the owner and set near the end of the job. The same quotation can be split so each party carries its part, and we coordinate dimensions, rough-ins, and delivery dates with the superintendent so owner-furnished equipment arrives when the building is ready for it.

For modular offices and rooms you see a three-dimensional rendering and a drawing set from your plan before the purchase order. Non-sealed drawings are standard on every quotation; PE-stamped drawings are an added line when the permit office asks for them.