Reading the metal building specification before bid day.

On a bid project the metal building is usually specified in Section 13 34 19, Metal Building Systems. Most of the price lives in a handful of clauses. Read those first, send the section with the drawings, and the quotation will match the documents instead of a guess at them.

Isometric drawing of steel frames, purlins, girts, and cross bracing in a new building

Representative drawing of the equipment type, not the exact configuration quoted.

How the section is organized

Like most specification sections it has three parts.

  • Part 1, General: references, design requirements, submittals, quality assurance, delivery, and warranty
  • Part 2, Products: framing, roof and wall panels, trim, insulation, accessories, and finishes
  • Part 3, Execution: erection, tolerances, field quality control, and cleaning
Cutaway drawing of a clear-span metal building interior with tapered rigid frames and no interior columns

Representative drawing of the equipment type, not the exact configuration quoted.

The clauses that move the price

These are the ones to find and flag.

  • Design loads and the governing code, including collateral loads and any crane or rooftop equipment
  • Deflection and drift limits tighter than the manufacturer's standard
  • Manufacturer qualifications, such as accreditation under IAS AC472 or a minimum number of years in business
  • Roof system: screw-down or standing seam, and any wind uplift rating required
  • Panel gauge, profile, and paint system, and whether a specific color is custom
  • Insulation system and the energy code it must meet
  • Warranties: weathertightness, finish, and their durations
  • Whether sealed drawings and calculations are required, and for which state
  • Erector qualifications, if the erector is specified in the same section

What to send us

The specification section, the structural general notes with the design loads, the architectural plans and elevations with the door and window schedules, and any addenda. If the documents name a basis-of-design manufacturer and allow equals, send the substitution requirements too.

The quotation lists each clause it takes exception to or clarifies. A short, explicit list is what lets you carry the number with confidence.

Questions

The spec names one manufacturer. Can another be used?
Only if the documents allow substitutions or list acceptable manufacturers. When they do, we quote the building to the specified requirements and provide the data for a substitution request. Acceptance is the architect's decision.
What is IAS AC472?
It is an accreditation program of the International Accreditation Service for the inspection and quality practices of metal building manufacturers. Many specifications require it. Whether the manufacturer on your quotation holds it is stated on the quotation.
The structural notes and the spec give different loads. Which governs?
Ask the design team in writing before the bid. We note the conflict on the quotation and state which value was used.