How the section is organized
Like most specification sections it has three parts.
- Part 1, General: references, design requirements, submittals, quality assurance, delivery, and warranty
- Part 2, Products: framing, roof and wall panels, trim, insulation, accessories, and finishes
- Part 3, Execution: erection, tolerances, field quality control, and cleaning
Representative drawing of the equipment type, not the exact configuration quoted.
The clauses that move the price
These are the ones to find and flag.
- Design loads and the governing code, including collateral loads and any crane or rooftop equipment
- Deflection and drift limits tighter than the manufacturer's standard
- Manufacturer qualifications, such as accreditation under IAS AC472 or a minimum number of years in business
- Roof system: screw-down or standing seam, and any wind uplift rating required
- Panel gauge, profile, and paint system, and whether a specific color is custom
- Insulation system and the energy code it must meet
- Warranties: weathertightness, finish, and their durations
- Whether sealed drawings and calculations are required, and for which state
- Erector qualifications, if the erector is specified in the same section
What to send us
The specification section, the structural general notes with the design loads, the architectural plans and elevations with the door and window schedules, and any addenda. If the documents name a basis-of-design manufacturer and allow equals, send the substitution requirements too.
The quotation lists each clause it takes exception to or clarifies. A short, explicit list is what lets you carry the number with confidence.