Line Item SupplyIndustrial Equipment
Request a Quote

Budgeting

Cost per square foot: the number everyone wants and nobody can use.

Published prices for metal buildings differ by several times from one website to the next, and each is probably true for some building somewhere. The trouble is that a square foot is not a unit of metal building. Here is what the published numbers leave out, and how to get one you can rely on.

Isometric drawing of ribbed roof panels being installed over purlins on a metal building

Representative drawing of the equipment type, not the exact configuration quoted.

Why the published numbers disagree

Before comparing two figures, find out these five things about each.

  • What it includes: the steel package only, or the package plus foundation, erection, insulation, and doors
  • Which system: rigid frame, cold-formed, or tube steel
  • What loads it was designed for, and where
  • How big the building was: small buildings cost more per square foot than large ones
  • When the number was written, because steel prices move
Isometric drawing of a long metal building with ribbed wall panels, overhead doors, and a navy wainscot

Representative drawing of the equipment type, not the exact configuration quoted.

What actually sets the price

Width, eave height, and the loads at the site set the weight of the frames. Openings, panels, the roof system, and insulation set most of the rest. Freight depends on weight and distance. Two buildings with the same floor area can be far apart in price for entirely sound reasons.

That is why we do not publish a price per square foot. A figure with no building and no site behind it would be a guess, and you would be budgeting on it.

How to compare two quotations

Line them up on the things that are easy to hide.

  • Same dimensions, eave height, and roof slope
  • Same code edition and the same snow, wind, seismic, and collateral loads
  • Same roof system and the same panel gauge and paint system
  • Same list of framed openings, doors, and windows
  • Insulation in or out, and to what value
  • Sealed drawings in or out
  • Freight in or out, and to where
  • How long the price is valid

Questions

Can you give me a ballpark?
Send the width, length, eave height, job site address, and the openings, and you get a quotation for that building, which is more useful than a range. For early budgeting a sketch is enough.
Why did the price change between two quotations a few months apart?
Most often because steel prices changed. Quotations carry a validity date for that reason. Changes to loads, openings, or options are the other common causes.
Is a metal building cheaper than other construction?
For large clear-span, single-story space it is usually an economical structural system, which is why most plants and warehouses are built this way. The comparison for your project depends on the whole building, not the steel alone.