Why the published numbers disagree
Before comparing two figures, find out these five things about each.
- What it includes: the steel package only, or the package plus foundation, erection, insulation, and doors
- Which system: rigid frame, cold-formed, or tube steel
- What loads it was designed for, and where
- How big the building was: small buildings cost more per square foot than large ones
- When the number was written, because steel prices move
Representative drawing of the equipment type, not the exact configuration quoted.
What actually sets the price
Width, eave height, and the loads at the site set the weight of the frames. Openings, panels, the roof system, and insulation set most of the rest. Freight depends on weight and distance. Two buildings with the same floor area can be far apart in price for entirely sound reasons.
That is why we do not publish a price per square foot. A figure with no building and no site behind it would be a guess, and you would be budgeting on it.
How to compare two quotations
Line them up on the things that are easy to hide.
- Same dimensions, eave height, and roof slope
- Same code edition and the same snow, wind, seismic, and collateral loads
- Same roof system and the same panel gauge and paint system
- Same list of framed openings, doors, and windows
- Insulation in or out, and to what value
- Sealed drawings in or out
- Freight in or out, and to where
- How long the price is valid