Line Item SupplyIndustrial Equipment
Request a Quote

For contractors · pre-engineered · cold-formed

Metal building packages, engineered to your site and shipped to it.

Pre-engineered rigid-frame buildings for wide clear spans and heavy use. Cold-formed steel buildings for smaller footprints and lighter budgets. Either way you get one package: framing, roof and wall panels, trim, fasteners, drawings, and freight, quoted from your dimensions and your site's loads.

Isometric drawing of a long metal building with ribbed wall panels, overhead doors, and a navy wainscot

Representative drawing of the equipment type, not the exact configuration quoted.

Building packages are sold through general contractors, design-builders, and erectors. Building for yourself? Have your contractor send the drawings, or tell us who is building it and we work with them.

Two systems, one way to buy

Rigid frame or cold-formed. We quote the one that fits.

In every package

What ships

  • Primary framing: rigid frames or cold-formed frames, columns, and endwalls
  • Secondary framing: purlins, girts, eave struts, and bracing
  • Roof and wall panels, trim, closures, sealants, and fasteners
  • Framed openings for the doors and windows you list
  • Anchor bolt plan and column reactions for the foundation engineer
  • Erection drawings; stamped drawings for the project state when required

Stated on every quotation

What is by others

  • Foundation design and concrete, which are sized from the column reactions
  • Erection, unless you ask for it to be quoted
  • Insulation, doors, and windows, unless you add them to the package
  • Permits and site work
The full scope list

The two systems

Rigid-frame and cold-formed buildings, and how to choose.

By what you are building

The decisions that matter for each kind of building.

Buying one

Scope, engineering, cost, and the steps from sketch to steel.

For the contractor's desk

The specification, submittals, reactions, scope by trade, and erection.

The shell and what goes in it, on one quotation.

A building is not finished when the steel is up. The dock wall needs levelers, seals, and doors. The floor needs offices, guardrail, and a mezzanine. We quote those too, so the framed openings, pits, column loads, and power are settled while the building is still being engineered.

Frequently asked

What is a metal building package?
It is the complete steel building as it ships from the factory: primary and secondary framing, roof and wall panels, trim, fasteners, and the drawings to anchor and erect it. The foundation, erection, and interior build-out are separate scopes unless you ask for them to be quoted.
What is the difference between a PEMB and a cold-formed building?
A pre-engineered metal building uses built-up rigid frames of welded plate, usually tapered, with cold-formed purlins and girts between them. A cold-formed building uses frames made from roll-formed galvanized sections. Rigid frames suit wide clear spans, cranes, and tall eaves. Cold-formed frames suit smaller buildings and are lighter to ship and erect.
What do you need to quote one?
Width, length, and eave height; the roof slope if you have a preference; the job site address for the design loads; what the building is used for; the doors and openings with their sizes; and anything hung from the roof or carried by the frames, such as cranes, mezzanines, or rooftop units.
Are the drawings stamped?
The building is engineered for the loads at your address under the code your jurisdiction has adopted. Stamped drawings and calculations for the project state are provided when the permit office requires them; the quotation states whether they are included or an added line.
Who designs the foundation?
A foundation engineer, using the anchor bolt plan and the column reactions that come with the building. The reactions depend on the frame type and the loads, so the foundation is designed after the building is engineered, not before.