A metal building mezzanine: carried by the building, or standing on its own.

There are two ways to put a second level inside a metal building. The building frame can carry it, or it can stand on its own columns and only share the roof. The first is decided when the building is ordered. The second can be decided any time, as long as the slab can take it.

Isometric drawing of steel frames, purlins, girts, and cross bracing in a new building

Representative drawing of the equipment type, not the exact configuration quoted.

The two approaches

A building-supported mezzanine ties its beams into the building columns, usually with added interior columns between them. Its load travels through the building frames to the building foundations. The mezzanine frame is engineered with the building and shows up in the column reactions.

A free-standing mezzanine is a separate structure with its own columns, beams, deck, and bracing. It touches the building only at the floor. It can be installed after the building is finished, changed, or moved, and it is engineered by the mezzanine supplier.

Building-supported and free-standing mezzanines compared
QuestionBuilding-supportedFree-standing
What carries itThe building frames, plus added interior columnsIts own columns and bracing
When it is decidedBefore the building is engineeredAny time, new building or existing
Effect on the building frameHeavier columns and larger reactionsNone, if it stays clear of the frame
Effect on the slab and foundationLoads go to the building footings and to footings under the added columnsColumn loads go to the slab or to new footings, which must be checked
Who engineers itThe building manufacturer's engineerThe mezzanine supplier's engineer
Changing it laterA structural change to the buildingCan be extended, altered, or relocated
Isometric drawing of a metal building's rigid frames, girts, and purlins before the panels go on

Representative drawing of the equipment type, not the exact configuration quoted.

Design inputs

Either kind is designed from the same short list. The floor load is the one that matters most, and it comes from the use, not from a guess.

  • Use: storage, office, production, or equipment platform
  • What is stored and how: shelving, pallets, or loose stock, and whether a pallet jack or cart runs on the deck
  • Size, clear height underneath, and height from the deck to the roof framing above
  • Column spacing you can live with on the floor below
  • Stairs: how many, where, and whether they are the exit path
  • Guardrail, and gates where pallets are loaded over the edge
  • Deck surface: steel deck with concrete, wood-product panels over steel deck, or grating

Adding a mezzanine to an existing metal building

To add a mezzanine to a metal building that was not designed for one, free-standing is nearly always the practical answer. The existing frames were sized for the loads on the original order. Hanging a floor from them needs a structural review and usually reinforcement.

A free-standing mezzanine still needs the slab checked. Each column puts a concentrated load on the concrete, and a slab poured for foot traffic and light storage may need footings cut in under the columns. Send the slab thickness and reinforcing if the drawings exist, and note where the building columns, bracing, and doors are so the mezzanine clears them.

Code items to raise with the building department

A mezzanine is a regulated part of the building. The building department will have a view on each of these, and it is better to hear it before the steel is ordered.

  • How large the mezzanine may be relative to the room it is in before it counts as a story
  • Number of exits, stair dimensions, and travel distance to an exit
  • Guards and handrails
  • Sprinklers under and over the mezzanine
  • Fire-resistance requirements for the structure
  • Accessibility, depending on the use
  • Seismic design, where it applies

One quotation for the building and the mezzanine

We supply mezzanines and guardrail as well as buildings, and this site has pages for both. On a new steel building with a mezzanine, that means the two can be quoted together and the loads coordinated before the frames are engineered.

Freight to the job site is included in every quotation. The foundation is by others and is designed from the column reactions, and erection or installation can be quoted as a separate line on request. Use the package builder on this site to send the building dimensions, and note the mezzanine in it.

Questions

Can I add a mezzanine to a metal building that is already built?
Yes, most reliably with a free-standing mezzanine on its own columns. The slab under each column has to be checked and may need footings. Supporting a mezzanine from the existing building frames requires an engineer's review first.
Is it cheaper to have the building carry the mezzanine?
Not always. A building-supported mezzanine saves some columns but makes the building frames and foundations heavier. A free-standing one leaves the building standard. The answer depends on the size and the floor load, and both can be quoted.
What is a mezzanine frame?
It is the structural steel of the mezzanine: columns, beams, joists or secondary beams, and bracing. The deck, stairs, and guardrail go on it. On a building-supported mezzanine part of that frame is the building itself.
Does a steel building with a mezzanine need a taller eave?
Usually. The eave height has to cover the clear height under the mezzanine, the depth of the mezzanine structure, and the headroom above the deck to the roof framing. Decide the mezzanine before the eave height.
Who can order a metal building mezzanine package?
Building packages are sold through contractors and erectors. If you are the owner, tell us who is building it and we will quote to your contractor.