Planning tools
80 free calculators for the people who run facilities
The arithmetic behind a quotation, in the open. Each calculator draws what it is figuring, states its rule and its source, asks for the readings a person can take with a tape and a string, and hands off to a quotation when you want the real number with freight.
Tracking tools
A PM schedule and work log for the whole plant: tasks by calendar or meter, what is due this week, one click to mark done, downtime and cost by machine, PM compliance. No account; the records stay in your browser with backup, CSV, and print.
Every forklift, leveler, door, compressor, and fan with its tag, location, make and model, serial, cost, meter, and status, imported from a spreadsheet or typed in, with the next PM beside each one.
Loading dock
Door size, dock height, bumpers, and two string readings on the drive in; side pad projection at the bottom and the top, the taper, the head pad or curtain, and the bumpers that keep the trailer off the wall.
Rated capacity from the lift truck's service weight, the heaviest load, and loads per hour, rounded up to a standard rating.
Working range above and below the dock and the grade at 6', 8', 10', and 12' lengths for the trailers that come to the door.
Trucks per day, hours of operation, time at the door, and the peak in; the door positions to build, the doors busy at the peak, and the utilization.
Dock height, the tallest trailer, and the grade of the approach in; how far the trailer top leans toward the wall and the bumper projection that keeps it 4 inches off.
Dock height and the tallest trailer in; the door height that clears it with a seal, the width, and the standard door to order.
Trailer and tractor lengths and the door spacing in; the apron depth from the dock face a driver needs to back in, and the dock-face length for the doors.
Trailer length, pallet size, loading pattern, and the weight per pallet in; the floor positions, the double-stack count, and which limit, cube or weight, you hit first.
How often the door opens and the hours it works in; cycles per year, the spring rating a sectional door needs, and whether a high-speed door is the right call.
Cold storage and condensation
Air temperature and humidity in, dew point out, with a check on whether a door, floor, pipe, or roof at a given temperature will sweat.
Outside air, the cold room temperature, and the door or floor surface in; whether it sweats, the dew point, and the humidity or surface temperature that keeps it dry out.
Door size, room and outside conditions, and how long the door stands open each hour in; the infiltration load in BTU/h and tons, with and without strip curtains, air curtains, or a fast door.
Room size, insulation, temperatures, product throughput, people, lights, and fans in; the load by part and the compressor capacity to ask for, in BTU/h and tons.
Inside temperature and humidity, outside temperature, and the roof or wall R-value in; the inside surface temperature, whether it drips, and the insulation that keeps it dry.
Cleanrooms and dry rooms
Particle counter readings at the sizes you measured in; the ISO 14644-1 class the room meets, the limits for each class at those sizes, the Federal Standard 209E equivalent, and how far you are from the next class.
Room size and the class in; the air changes per hour the class needs, the supply cfm, the number of 2x4 fan filter units, the ceiling coverage, and the fan power.
Air changes and how dirty the room got in; how long until it is back under its class limit, and the 100:1 recovery time ISO 14644-3 tests.
The pressure you want to hold and the leakage paths, door gaps, pass-throughs, and panel joints in; the makeup air that keeps the room positive, and what a door opening does to it.
A dew point in °C or °F in; the moisture content in g/kg, grains per pound, and ppmv, and the relative humidity it is at room temperature.
Room size, people, door traffic, makeup air, and the dew point in; the water the dehumidifier has to remove each hour by source, and the desiccant airflow to hold the room.
Air, heating, and ventilation
Floor size, ceiling height, and the kind of space in; the fan diameter, how many, the grid, and the minimum ceiling, by the coverage rule and the air-turnover check.
Air speed at the person in; the perceived temperature drop and the effective temperature, from the ASHRAE 55 elevated air speed comfort offset.
Ceiling height, the floor and ceiling temperatures now, and the heating bill in; the stratification, the average temperature cut by mixing the air, and the heating saved.
Room size and the air changes the use calls for in; the exhaust cfm, and how many fans of a given size.
Trucks running inside and the building size in; the dilution cfm by the ACGIH rule, the air changes that is, and the fans.
Building size, how well it is insulated, the inside and outside design temperatures, and the dock door traffic in; the heat loss in BTU/h and the unit heaters to cover it.
Space size and how hot it runs in; the cfm of evaporative cooling, the units, the relief opening, and the temperature drop your humidity allows.
Electrical
Wire size, length, load, and voltage in; the drop in volts and percent, the voltage at the load, and the smallest wire that holds 3%.
Load amps, continuous or not, copper or aluminum in; the smallest conductor from the NEC 75°C table and the breaker that goes with it.
Load in watts or amps, voltage and phase in; the current, the 125% continuous rule, and the standard breaker.
Horsepower, voltage, and phase in; the NEC table full-load current, the conductor at 125%, and the largest inverse-time breaker the Code allows.
Line frequency, pole count, and slip in; the synchronous and full-load rpm, and what changes when a 60 Hz machine runs on 50 Hz or the other way around.
Enter the one you know, kW, kVA, amps, or hp, with the voltage, phase, power factor, and efficiency; get the other three.
Connected load, growth, voltages, and phase in; the kVA, the next standard size, and the primary and secondary full-load currents.
Running load, the largest motor, and the voltage in; the kW and kVA the generator needs to carry the load and start that motor, and the next standard set.
Watts or amps, hours, days, and the rate in; kWh and dollars per month and year.
Load kW, the power factor now, and the target in; the kVAR of capacitors to add, the kVA freed up, and the current reduction.
Motor size, the speed the process actually needs, hours, and the rate in; the power at reduced speed by the cube law, and the kWh and dollars saved per year.
Floor size, the light level the work needs, and the fixture's lumens in; the fixture count, the grid, the spacing, and the connected watts.
Heater kW in; the BTU per hour it delivers, the amps it draws at the voltage, the breaker, and the wire.
Fixture count, old and new watts, hours, rate, and the installed cost in; the yearly savings, the simple payback, and the ten-year net.
Material handling and racking
The truck's turning radius and head length, the load length, and the clearance in; the aisle a lift truck needs to turn into a rack bay.
The truck's rated capacity and load center, the load's actual center, and the axle-to-fork distance in; what the truck can safely lift with that load.
Rise and run in, or the grade you have; the percent and degrees, whether a forklift, pallet jack, or walking traffic can use it, and the run needed to hit the limit.
Pallets per level, pallet weight, levels, and the beam rating in; the load on each beam pair, the load on the frame, and the slab pressure under the base plate.
Building size, aisle width, rack depth, bay width, and levels in; the rows, the positions, and the cube the racking uses.
Mezzanine size, the use, and the column grid in; the design live load, the total load, and what each column puts on the slab.
Belt speed, case length, and the gap between cases in; cases per minute and per hour, and the speed needed for a target rate.
Pallet moves per shift, the cycle time, hours, and utilization in; the trucks needed and the moves each one makes.
Cylinders per shift and their price against kWh per charge and the power rate, with shifts per year and maintenance; the yearly running cost of each truck and the difference.
Forklift weight with its load and the speed it could hit at in; the impact energy, and whether a guardrail or barrier rated for a given weight at a given speed takes it.
Belt length, speed, the load on it, the bed type, and any incline in; the drive horsepower and the standard motor.
Metal buildings and structure
The whole gable drawn: square-cut endwall panels, bottom of the eave beam plus the lap and the drop below the slab, stepped up the rake so the roof goes over the top with no field cutting.
Roof panel length and count, sidewall and endwall panels, square feet of sheeting, and the lineal feet of eave, rake, ridge, corner, and base trim from the building's dimensions.
Ground snow load, exposure, thermal condition, and importance in; the flat-roof snow load the frames are designed for, by the ASCE 7 method, with the low-slope minimum.
The insulation system in; the assembly R and U, the heat loss per thousand square feet at your design temperatures, and what an upgrade saves.
Roof area draining to one gutter, the pitch, and the local rainfall in; the gutter size, the downspouts, and the spacing.
Rise per 12 in; the angle, the percent, the slope multiplier, and the rafter or panel length for your run.
Slab size and thickness, footing size and run, and a ramp if there is one in; the cubic yards for each, the waste, and the truckloads.
Offices, people, and code
People, the kind of office, and the rooms in; the square footage, a footprint that fits a modular panel module, and the furniture count.
Office size, people, equipment, windows, and the plant it sits in; the cooling load in BTU/h and tons, the heating load, and the unit to ask for.
Receptacles, lighting, HVAC, and equipment in; the 20 A circuits, the panel size, and the feeder to the office.
Occupancy type and the occupant load in; the water closets, lavatories, drinking fountains, and service sink the International Plumbing Code requires.
Floor area and the use in; the code occupant load, the exits required, the egress width, and the travel distance limit.
Floor-to-floor height and the code the stair falls under in; the riser count and height, the tread, the total run, the stringer length, and the landings.
The rise in; the ramp length at 1:12, the landings, and the total footprint, with the straight and switchback layouts.
Run length, post spacing, corners, and gaps in; the posts, rail sections, base plates, and anchors to order.
Length to protect, spacing, and the things that get their own pair in; the bollards, the anchors, and the concrete if they are set in the ground.
Efficiency and labor
Planned time, downtime, ideal cycle time, total count, and rejects in; availability, performance, quality, OEE, and where the lost time went.
Units handled, the people and hours it took, and the loaded wage in; units per labor hour, labor cost per unit, the gap to your target, and what closing it is worth.
Customer demand and the time available in; the takt time the line must hit, how it compares with the cycle time, and the stations or people needed to keep up.
Energy and payback
First-year deduction and the cash cost after it for a modular office, mezzanine, or dock equipment purchase.
Leak size, line pressure, hours, and the power rate in; the air lost, the compressor power it takes, and the dollars a year, per leak and for the plant.
The tools and how hard they run, leaks, and growth in; the cfm the compressor needs, the horsepower, and the receiver tank.
What it costs, what it saves or earns each year, and what it costs to keep in; the payback, the five- and ten-year net, and the return.
Enter a heating or cooling figure in any unit; get it in BTU/h, tons of refrigeration, kW, horsepower, and therms per hour.
Cost, recovery period, Section 179 election, bonus percentage, and your tax rate in; the deduction every year, the tax saved, and how much of the price the first year returns.
Cost, yearly savings or revenue, running cost, the depreciation and tax rate, your cost of money, and the life in; the after-tax cash flow by year, payback, net present value, and internal rate of return.