Cleanroom pressure and offset air: the guide
A cleanroom stays clean partly by leaking outward. The offset air that keeps it positive is leakage through every gap, and the open door is the gap that matters.
Why this number matters
Classified rooms are held a little above the pressure of the space around them so that any air passing through gaps and door seams flows out, carrying nothing in. The usual steps are 0.02 to 0.05 inches of water, 5 to 12 pascals, between zones, stepping down through an airlock to the plant. The supply fan delivers more air than the return takes, and the difference leaks out; the orifice equation turns the leakage area and the pressure into cfm, which is the makeup air the HVAC must condition.
Door gaps dominate the leakage area in a tight modular room: a 3-foot door with a half-inch undercut and unsealed sides is about 30 square inches, and gasketed doors cut that to a few. Pass-throughs, panel joints, and ceiling grid add the rest. Exhaust from hoods or process is lost air too and has to be made up on top.
An open door is a very large orifice, and at these small pressures a 3 by 7 opening passes thousands of cfm, far more than the offset; the room's pressure collapses while the door is open and the only thing holding particles out is the velocity across the opening. That is the argument for airlocks on busy doors and for air showers where the gowning rules are strict.
How it is figured
- Leakage through gaps follows the orifice equation: Q (cfm) = 2,610 × A (ft²) × √ΔP (in. w.c.), which is 4,005 × √ΔP × A with a discharge coefficient of 0.65. Offset air = that leakage plus any exhaust the room loses.
- An open door is a very large orifice: at 0.03 in. w.c. a 3 by 7 door passes about 9,500 cfm, far more than the offset, so the room's pressure collapses until it closes; the velocity across the opening is what keeps particles out.
A worked example
Three doors at 24 square inches of gaps and 20 square inches of other leakage is 92 square inches; at 0.03 inches of water that leaks 289 cfm, which is the offset air with no exhaust. Open a 36 by 84 inch door and 9,500 cfm flows out at about 450 feet per minute until it closes.
The tool's starting values, and what it returns for them:
| Pressure to hold | 0.03 in. w.c. (7.5 Pa) |
| Doors | 3 |
| Leakage area per door | 24 sq in |
| Other leakage | 20 sq in |
| Exhaust taken from the room | 0 cfm |
| Largest door, width | 36 in |
| height | 84 in |
| Offset makeup air | 289 cfm |
| Pressure | 7.5 Pa |
| Air out through the open door | 9,493 cfm |
| Total leakage area | 92 sq in |
| Leakage flow | 289 cfm |
Mistakes that catch people
- Specifying 0.1 inch of water or more: doors become hard to open and the gaps whistle.
- Forgetting process exhaust in the offset; the room goes negative when the hood runs.
- Balancing the room with the doors open and finding it negative with them closed, or the reverse.
Rules of thumb
- 0.02 to 0.05 inches of water between zones; 5 to 20 pascals in ISO 14644-4 terms.
- A square inch of gap at 0.03 inches of water leaks about 3 cfm.
- An open door at that pressure passes over 100 cfm per square foot.
When to stop calculating and make a call
- Multi-room cascades and airlocks: the pressure map and the control sequence are a mechanical design.
- A room that will not hold pressure after balancing: a smoke test finds the leak.
Questions people ask
- How much positive pressure should a cleanroom have?
- 0.02 to 0.05 in. w.c. (5 to 12.5 Pa) above the next space out, stepping down through an airlock to the plant; ISO 14644-4 suggests 5 to 20 Pa between zones. More than 0.1 makes doors hard to open and whistles through the gaps.
- Where does the offset air come from?
- The HVAC unit supplies more air than it returns; the difference leaks out through the gaps and keeps the room positive. That makeup air has to be filtered and conditioned, which is why tight construction, gasketed doors, and a sealed ceiling grid save energy every hour the room runs.
Standards and sources
- ASHRAE Handbook, HVAC Applications, Clean Spaces (pressurization and offset airflow)
- ISO 14644-4, Annex A (pressure differentials 5 to 20 Pa between classified spaces)
This guide and the tool are planning aids. The equipment maker, the engineer of record, the accountant, or the code official confirms the final number for your building.