Line Item SupplyIndustrial Equipment
Request a Quote

Metal buildings and structure

Wall and roof R-value, U-factor, and heat loss

The insulation system in; the assembly R and U, the heat loss per thousand square feet at your design temperatures, and what an upgrade saves.

Read the guide: what the number means and how to use it

  • Assembly R = insulation R (× 0.6 for a single blanket compressed over purlins, per MBMA and ASHRAE 90.1 assembly tables) + air films (0.68 inside, 0.17 outside). U = 1 ÷ R.
  • Heat loss = U × area × temperature difference. Annual energy = that × equivalent full-load heating hours; cost at the delivered price per million BTU.

Need it quoted?

Send the footprint, eave height, and openings and the quotation comes back with frames, sheeting, trim, insulation, and doors as line items.

Metal buildings

R-value and heat loss

loss now8,759 BTU/hloss after1,945 BTU/h

Assembly R now

6.9

U 0.146

Heat loss per 1,000 sq ft now

8,759 BTU/h

at 60°F difference

Upgrade saves per year

1,227 $

R-10 to R-30 over 10,000 sq ft

  • A single blanket draped over purlins is compressed to about 60% of its labeled R at the purlins and between; R-10 performs near R-6. Liner systems hold the full value, which is the step change in the numbers above.
Assembly R after
30.9U 0.032
Heat loss per 1,000 sq ft after
1,945 BTU/h
Energy saved per year
102.2 million BTU

One line for the file or the vendor

R-10 compressed (assembly R 6.9, U 0.146) at 60°F: 8759 BTU/h per 1,000 sq ft; upgrade to R-30 saves 102.2 MMBTU and $1227/yr on 10,000 sq ft.

Keep this result, or have it priced

One email with what you asked for. No list, no newsletter.

How it is figured

  • Assembly R = insulation R (× 0.6 for a single blanket compressed over purlins, per MBMA and ASHRAE 90.1 assembly tables) + air films (0.68 inside, 0.17 outside). U = 1 ÷ R.
  • Heat loss = U × area × temperature difference. Annual energy = that × equivalent full-load heating hours; cost at the delivered price per million BTU.

Sources: ASHRAE 90.1, Appendix A, assembly U-factors for metal building roofs and walls; MBMA Energy Design Guide for Metal Building Systems. A planning calculator; the maker, the engineer of record, or the code official confirms the final number.

Questions people ask

Why does a liner system matter so much?
Because the blanket is not compressed. A draped R-19 tests near U-0.08 as an assembly; an R-30 liner system near U-0.035, less than half the loss. Energy codes have moved to liner systems or filled cavities for that reason.

Related calculators: Metal roof condensation, Warehouse heater BTU, Roof snow load. All calculators.