Line Item SupplyIndustrial Equipment
Request a Quote

Metal buildings and structure

Roof pitch to degrees, percent, and rafter length

Rise per 12 in; the angle, the percent, the slope multiplier, and the rafter or panel length for your run.

Read the guide: what the number means and how to use it

  • Angle = arctan(rise ÷ 12). Percent = rise ÷ 12 × 100. Slope multiplier = √(12² + rise²) ÷ 12; rafter length = run × multiplier.

Need it quoted?

Send the footprint, eave height, and openings and the quotation comes back with frames, sheeting, trim, insulation, and doors as line items.

Metal buildings

Roof pitch converter

1214.8° · 8.3%

Angle

4.76 °

Slope

8.33 %

Rafter or panel length

40.14 ft

40 ft run × 1.0035

Slope multiplier
1.0035
Total rise over the run
3.33 ft

One line for the file or the vendor

1:12 = 4.76° = 8.33%; multiplier 1.0035; 40 ft run = 40.14 ft rafter, 3.33 ft rise.

Keep this result, or have it priced

One email with what you asked for. No list, no newsletter.

How it is figured

  • Angle = arctan(rise ÷ 12). Percent = rise ÷ 12 × 100. Slope multiplier = √(12² + rise²) ÷ 12; rafter length = run × multiplier.

Sources: Trigonometry. A planning calculator; the maker, the engineer of record, or the code official confirms the final number.

Questions people ask

What pitch do metal buildings use?
Most pre-engineered buildings are 1:12 (about 4.8°) or 0.5:12; 4:12 is common where the look matters or snow sheds. The sheeting calculator uses the same multiplier for roof panel lengths.

Related calculators: Metal building sheeting take-off, Gable endwall panel lengths, Roof snow load. All calculators.