Metal building calculator
Roof and wall sheeting take-off for a metal building
Width, length, eave height, and pitch in; roof panel length and count, sidewall and endwall panels, square feet of sheeting, and the trim lineal feet out. Use it to budget a shell, sanity-check a quotation, or order sheeting for a re-skin.
- Peak height and rafter slope length.
- Panels round up to whole sheets, lengths to your cut increment.
- Eave, rake, ridge, corner, and base trim.
Need the building priced?
Send the footprint, eave height, and openings and the quotation comes back with frames, sheeting, trim, insulation, and doors as line items.
Metal buildingsGable building, symmetric, sheeting and trim take-off
- Rise to the peak
- 1'-8"
- Peak height
- 17'-8"
- Rafter slope length, eave to peak
- 20'-0 3/4"
- Roof panel length (slope + eave overhang, rounded up)
- 20'-4"
- Roof panels
- 21 per side, 42 total, 2,562 sq ft
- Sidewall panels
- 20 per side at 16'-0", 1,920 sq ft
- Endwall panels, square cut (beam bottom + 5 1/2")
- 14 per endwall, 1,404 sq ft both ends, max step 0'-3"
- Sheeting, all faces
- 5,886 sq ft
Trim
| Eave trim or gutter, both sides | 120 lin ft |
| Rake trim, four rakes | 81 lin ft |
| Ridge cap | 60 lin ft |
| Corner trim, four corners | 64 lin ft |
| Base trim or angle | 200 lin ft |
Gross take-off with no deduction for framed openings and no waste; add the openings' jamb and header trim and the maker's waste factor. Panel counts round up to whole sheets. The endwall lengths come from the endwall panel calculator.
Read the guide: what the number means and how to use it
Questions erectors ask
- How is the roof panel length figured?
- The rafter slope length from the eave to the peak, plus the eave overhang measured along the slope, rounded up to the cut increment. A 40-foot-wide building on a 1:12 pitch has a 20-foot run, a 20-inch rise, and a slope just over 20 feet 1 inch, so a 3-inch overhang gives a 20-foot 4-inch roof sheet.
- Why are endwall panels different lengths?
- They run vertical and stop at the rake, so every panel is longer than the one nearer the corner. The square-cut method cuts them to the rake height at the low edge and lets the rake trim close the step; the endwall calculator shows every length and the cut list.
- Does the take-off deduct for doors and windows?
- No. It is a gross sheeting and trim count for budgeting and for checking a quotation. Framed openings add jamb and header trim and remove some panel area, and the building maker's bill of material governs the order.
- What panel width should I use?
- 36-inch coverage for PBR and R panel, the usual exposed-fastener panels on industrial buildings. Concealed-fastener standing seam panels run 24, 18, or 16 inches, and the roof count changes with them.