Metal building calculator
Endwall panel lengths, square cut, following the rake
Give it the endwall width, the height from the top of the concrete to the bottom of the eave beam, the roof pitch, and the panel width. It draws the whole gable and returns every panel length from the left corner to the right corner: bottom of the beam at the panel's low edge, plus 4 inches to fasten to the beam, plus 1 1/2 inches below the slab, cut square so the roof goes over the top with no field cutting. You get the schedule, the cut list, the same wall at every common pitch, and a flag on any panel the pitch forces to be cut to the rake.
- Gable or single slope, any pitch, any panel coverage width, four panel layouts.
- Sawtooth step checked against the lap left on the beam at the high edge.
- Square lengths round down to the cut increment so nothing projects above the beam.
Pricing the building?
Send the footprint and the openings and the quotation comes back with the frames, sheeting, trim, and doors as line items, freight to the site included.
Metal buildings for contractorsSquare-cut endwall panels, whole wall
square-cut panel*bottom of the eave and rake beampanel cut to the rake in the field, ordered to its high edgeHover a panel for its numbers.
* Panel length = top of concrete to bottom of the beam at the panel's low edge + 4" to fasten to the beam + 1 1/2" below the slab, cut square. The roof goes over the top; no field cutting of the wall panels.
- Bottom of beam at the ridge
- 17'-8"
- Panels per endwall
- 14 (1 cut width)
- Sawtooth step, every full panel
- 3" (36" x 1:12)
- Lap left on the beam at a full panel's high edge
- 1"
- Longest panel
- 17'-11 1/2"
- Total panel length per endwall
- 240 lin ft
- No field cutting: every panel still laps the beam at least 1" at its high edge
- 3" max step
Panel schedule, left corner to right corner
| # | Left edge from corner | Width | Order length* | Beam bottom, low edge | Beam bottom, high edge | Step | Lap at high edge | Cut |
|---|---|---|---|---|---|---|---|---|
| 1 | 0'-0" | 36" | 16'-5 1/2" | 16'-0" | 16'-3" | 3" | 1" | square |
| 2 | 3'-0" | 36" | 16'-8 1/2" | 16'-3" | 16'-6" | 3" | 1" | square |
| 3 | 6'-0" | 36" | 16'-11 1/2" | 16'-6" | 16'-9" | 3" | 1" | square |
| 4 | 9'-0" | 36" | 17'-2 1/2" | 16'-9" | 17'-0" | 3" | 1" | square |
| 5 | 12'-0" | 36" | 17'-5 1/2" | 17'-0" | 17'-3" | 3" | 1" | square |
| 6 | 15'-0" | 36" | 17'-8 1/2" | 17'-3" | 17'-6" | 3" | 1" | square |
| 7 ▲ | 18'-0" | 36" | 17'-11 1/2" | 17'-6" | 17'-8" | 2" | 2" | square |
| 8 | 21'-0" | 36" | 17'-9 1/2" | 17'-4" | 17'-7" | 3" | 1" | square |
| 9 | 24'-0" | 36" | 17'-6 1/2" | 17'-1" | 17'-4" | 3" | 1" | square |
| 10 | 27'-0" | 36" | 17'-3 1/2" | 16'-10" | 17'-1" | 3" | 1" | square |
| 11 | 30'-0" | 36" | 17'-0 1/2" | 16'-7" | 16'-10" | 3" | 1" | square |
| 12 | 33'-0" | 36" | 16'-9 1/2" | 16'-4" | 16'-7" | 3" | 1" | square |
| 13 | 36'-0" | 36" | 16'-6 1/2" | 16'-1" | 16'-4" | 3" | 1" | square |
| 14 | 39'-0" | 12" | 16'-5 1/2" | 16'-0" | 16'-1" | 1" | 3" | square |
▲ straddles the ridge. * Bottom of beam at the low edge + 4" lap + 1 1/2" below the slab, rounded down to the increment. A rake-cut panel is ordered to its high edge plus the same 5 1/2", rounded up, and the slope is cut in the field.
Cut list, one endwall
Every pitch, panel by panel
Order lengths for the same wall and layout at each common pitch. Click a pitch to draw it. Red means the panel has to be cut to the rake at that pitch.
| # | Width | 1/4:12 | 1/2:12 | 1:12 | 1 1/2:12 | 2:12 | 3:12 | 4:12 |
|---|---|---|---|---|---|---|---|---|
| 1 | 36" | 16'-5 1/2" | 16'-5 1/2" | 16'-5 1/2" | 16'-10" | 16'-11 1/2" | 17'-2 1/2" | 17'-5 1/2" |
| 2 | 36" | 16'-6" | 16'-7" | 16'-8 1/2" | 17'-2 1/2" | 17'-5 1/2" | 17'-11 1/2" | 18'-5 1/2" |
| 3 | 36" | 16'-7" | 16'-8 1/2" | 16'-11 1/2" | 17'-7" | 17'-11 1/2" | 18'-8 1/2" | 19'-5 1/2" |
| 4 | 36" | 16'-7 1/2" | 16'-10" | 17'-2 1/2" | 17'-11 1/2" | 18'-5 1/2" | 19'-5 1/2" | 20'-5 1/2" |
| 5 | 36" | 16'-8 1/2" | 16'-11 1/2" | 17'-5 1/2" | 18'-4" | 18'-11 1/2" | 20'-2 1/2" | 21'-5 1/2" |
| 6 | 36" | 16'-9" | 17'-1" | 17'-8 1/2" | 18'-8 1/2" | 19'-5 1/2" | 20'-11 1/2" | 22'-5 1/2" |
| 7 | 36" | 16'-10" | 17'-2 1/2" | 17'-11 1/2" | 18'-8 1/2" | 19'-9 1/2" | 21'-5 1/2" | 23'-1 1/2" |
| 8 | 36" | 16'-9 1/2" | 17'-1 1/2" | 17'-9 1/2" | 18'-10" | 19'-7 1/2" | 21'-2 1/2" | 22'-9 1/2" |
| 9 | 36" | 16'-8 1/2" | 17'-0" | 17'-6 1/2" | 18'-5 1/2" | 19'-1 1/2" | 20'-5 1/2" | 21'-9 1/2" |
| 10 | 36" | 16'-8" | 16'-10 1/2" | 17'-3 1/2" | 18'-1" | 18'-7 1/2" | 19'-8 1/2" | 20'-9 1/2" |
| 11 | 36" | 16'-7" | 16'-9" | 17'-0 1/2" | 17'-8 1/2" | 18'-1 1/2" | 18'-11 1/2" | 19'-9 1/2" |
| 12 | 36" | 16'-6 1/2" | 16'-7 1/2" | 16'-9 1/2" | 17'-4" | 17'-7 1/2" | 18'-2 1/2" | 18'-9 1/2" |
| 13 | 36" | 16'-5 1/2" | 16'-6" | 16'-6 1/2" | 16'-11 1/2" | 17'-1 1/2" | 17'-5 1/2" | 17'-9 1/2" |
| 14 | 12" | 16'-5 1/2" | 16'-5 1/2" | 16'-5 1/2" | 16'-5 1/2" | 16'-5 1/2" | 16'-5 1/2" | 16'-9 1/2" |
Each panel starts 1 1/2" below the top of the concrete and runs 4" past the bottom of the beam at its low edge, where it fastens to the beam. The square top stays below the roof, so the roof goes over with no field cutting, and the panel's high edge keeps whatever lap the sawtooth step leaves. Framed openings, the door headers, girt lines, and the building maker's own erection drawings govern the order.
Read the guide: what the number means and how to use it
Questions erectors ask
- Why cut endwall panels square instead of to the rake?
- Square cuts come straight off the mill at the ordered length, go up faster, and leave no field-cut edge at the rake. Each panel is cut to the bottom of the beam at its edge nearer the eave plus the 4-inch lap it fastens with, so nothing projects above the beam and the roof sheets go over the top. At the other edge the beam has risen by the sawtooth step, and the panel keeps whatever lap is left.
- When does the pitch force a cut to the rake?
- The sawtooth step is the panel width times the pitch: a 36-inch panel on a 1:12 roof steps 3 inches and keeps 1 inch of lap on the beam at its high edge; on 2:12 it steps 6 inches and the high edge falls 2 inches short of the beam. Once the lap left is under the minimum you set, those panels are ordered to their high edge and cut on the rake angle in the field. The calculator flags each one and gives the length to order.
- Where are the heights measured from?
- From the top of the concrete to the bottom of the eave beam at the corner. The bottom of the rake beam rises from there at the roof pitch to the ridge for a gable, or to the high side for a single slope. Every panel then adds the lap onto the beam and the drop below the slab, 5 1/2 inches with the defaults.
- Does this replace the building maker's erection drawings?
- No. It gives the panel lengths and the cut list for planning, ordering, and checking a quotation. Framed openings, door headers, girt lines, and any notch at the base follow the erection drawings for the building.
More calculators: metal building sheeting take-off, dock leveler capacity, leveler length and working range.