Metal buildings and structure · guide
Gable endwall panel lengths: the guide
Endwall panels run vertical and stop under a sloping rake beam. Cut them square to the beam at the low edge, let the step ride up the pitch, and the roof sheets go over the top with no field cutting; the whole wall comes off the mill at ordered lengths.
Why this number matters
On a sidewall every panel is the same length. On a gable endwall the beam the panels fasten to rises from the eave to the ridge at the roof pitch, so every panel is a different length and the question is how to cut the top. The traditional answer is to cut each panel on the rake angle, which means every panel is marked and cut in the field with a nibbler or a saw, slowly, with a raw edge at the top. The shop rule this tool follows cuts every panel square at the mill: the length is the height from the top of the concrete to the bottom of the beam at the panel's low edge, plus 4 inches to fasten to the beam, plus 1 1/2 inches below the slab. Nothing projects above the beam, so the roof sheets go over the top and the rake trim closes the sawtooth.
The sawtooth is the catch. Across a 36-inch panel on a 1:12 roof the beam rises 3 inches, so a panel cut to its low edge keeps 1 inch of the 4-inch lap at its high edge. That is enough. At 2:12 the beam rises 6 inches across the panel, the high edge falls 2 inches short of the beam, and there is nothing to fasten to. The tool checks every panel against the minimum lap you set; those that fall short get ordered to the high edge and flagged for a field cut on the rake. Narrower panels step less, which is why 24-inch and 16-inch panels stay square at pitches where 36-inch panels cannot.
The layout decides where the cut width lands. Start with full panels at the left corner and the cut width is at the right; start at both corners and the cut widths meet at the ridge; put a joint or a panel center on the ridge for a symmetric wall. The lengths change by an inch or two between layouts because the low edges land at different points on the rake, and the tool shows all four so the erector and the sheeting order agree.
How it is figured
- Beam height at any point = height to the bottom of the eave beam + the distance in from the corner × pitch ÷ 12, up to the ridge and back down for a gable, or straight across for a single slope.
- Each panel's square length = beam height at its low edge + lap onto the beam (4") + drop below the slab (1 1/2"), rounded down to the cut increment so nothing projects above the beam.
- Lap left at the high edge = square length − drop − beam height at the high edge. When it is under the minimum lap, the panel is cut to the rake and its order length is the high edge + lap + drop, rounded up.
- Step per full panel = panel width × pitch ÷ 12; a 36" panel on 1:12 steps 3".
- The cut list groups the same length and width; totals are lineal inches of panel to order.
A worked example
A 40-foot gable with 16 feet from the top of the concrete to the bottom of the eave beam, 1:12 pitch, 36-inch panels, full panels from the left corner. Fourteen panels, 16'-5 1/2" at the corners and 17'-11 1/2" at the ridge panel, stepping 3 inches each; the fourteenth is a 12-inch cut width. Every panel keeps at least 1 inch of lap at its high edge, so nothing is cut to the rake.
The tool's starting values, and what it returns for them:
| Endwall width | 40'-0" |
| Top of concrete to bottom of eave beam | 16'-0" |
| Pitch | 1:12, gable |
| Panel coverage | 36" |
| Lap onto the beam | 4" |
| Drop below the slab | 1 1/2" |
| Layout | Full panels from the left corner |
| Panels | 14, the last a 12" cut width |
| Corner panels | 16'-5 1/2" |
| Ridge panel | 17'-11 1/2" |
| Step per panel | 3" |
| Lap left at the high edge | 1" to 3", none cut to the rake |
| Beam bottom at the ridge | 17'-8" |
| Total panel to order | 2,879 lineal inches |
What to take off the drawings or the building
- Endwall width out to out of the steel line, from the erection drawings or a tape across the slab at the endwall.
- Height from the top of the concrete to the bottom of the eave beam at the corner, not the eave height on the drawing, which is to the top of the beam or the roof line.
- Roof pitch from the drawings, in inches per foot.
- Panel coverage width from the panel profile: 36" for PBR and R panel, 24", 18", or 16" for concealed-fastener panels.
- Your mill's cut increment, usually 1/2" or 1", and the minimum lap you will accept at the high edge.
Tools: the erection drawings, a tape, the panel profile sheet
Mistakes that catch people
- Measuring to the top of the beam or to the eave line on the drawing. The panel stops under the beam; the number is to the bottom of it.
- Rounding the square length up instead of down; a half inch above the beam is a half inch the roof sheet has to ride over.
- Using 36-inch panels on a 2:12 roof and expecting square cuts. The step is 6 inches and every panel comes up short at the high edge.
- Forgetting the drop below the slab, so the base trim has nothing to close against.
- Ordering from one layout and erecting from another, which puts the cut width on the wrong corner and changes every length by the offset.
Rules of thumb
- Panel length = bottom of beam at the low edge + 4" + 1 1/2", cut square.
- Step = panel width × pitch ÷ 12. Square cuts work while the step is less than the lap by at least the minimum you set.
- 36" panels stay square at 1:12; 24" panels at 1 1/2:12; go to rake cuts or narrower panels above that.
When to stop calculating and make a call
- The endwall has framed openings, a header, or a notch at the base: the erection drawings govern those panels.
- The building is an expandable endwall with a full rigid frame rather than bearing-frame columns and a rake beam; the panels may stop at a different line.
- Insulated metal panels or standing seam on the wall: the maker's details decide the top termination.
Questions people ask
- Why cut endwall panels square instead of to the rake?
- Square cuts come straight off the mill at the ordered length, go up faster, and leave no field-cut edge at the rake. Each panel is cut to the bottom of the beam at its edge nearer the eave plus the 4-inch lap, so nothing projects above the beam and the roof sheets go over the top.
- When does the pitch force a cut to the rake?
- The sawtooth step is the panel width times the pitch: a 36-inch panel on a 1:12 roof steps 3 inches and keeps 1 inch of lap at its high edge; on 2:12 it steps 6 inches and the high edge falls 2 inches short of the beam. Once the lap left is under the minimum, those panels are ordered to their high edge and cut on the rake angle in the field.
- Where are the heights measured from?
- From the top of the concrete to the bottom of the eave beam at the corner. The bottom of the rake beam rises from there at the roof pitch to the ridge. Every panel then adds the lap onto the beam and the drop below the slab.
- Does this replace the building maker's erection drawings?
- No. It gives the panel lengths and the cut list for planning, ordering, and checking a quotation. Framed openings, door headers, girt lines, and any notch at the base follow the erection drawings.
Standards and sources
- Metal building erection practice: endwall sheeting to a rake beam, square-cut panels and the rake trim closure
- Panel makers' profile sheets for PBR, R, and concealed-fastener panels: coverage widths and cut increments
- Line Item Supply: metal building sheeting take-off
This guide and the tool are planning aids. The equipment maker, the engineer of record, the accountant, or the code official confirms the final number for your building.