Metal buildings and structure · guide
Roof snow load: the guide
The snow a roof is designed for starts from the ground snow load on the map and comes down through exposure and heating; the number on the building order should match this one.
Why this number matters
ASCE 7 maps the ground snow load for the country, the weight of snow on the ground that has a 2% chance of being exceeded in a year: about 30 psf in lower Michigan, 50 in Minnesota, 70 in parts of New England, higher in the mountains. A roof holds less than the ground because wind scours it and heat from below melts the bottom, so the flat roof snow load is 0.7 times the ground load, adjusted up for a sheltered site, an unheated building, and an important occupancy. A low-slope roof also has a minimum, because a single storm can drop more on a roof than the statistics expect.
Those are the loads before the ones the engineer adds: drifts against parapets, rooftop units, and taller neighbors, sliding snow from a higher roof, unbalanced snow on a gable, and rain on snow. A drift against a taller wall can be three times the flat load over the first twenty feet, which is why the building's own snow load is not the whole story on an addition.
The practical use is checking what you are buying. A metal building quote states the ground snow and the roof snow it was engineered for; if the ground snow is low for the county, or the thermal factor assumes a heated building that will be a cold warehouse, the quote is wrong before the steel is cut.
How it is figured
- ASCE 7-16 Section 7.3: flat roof snow load pf = 0.7 × Ce × Ct × Is × pg.
- Section 7.3.4 minimum for low-slope roofs: pm = Is × pg where pg is 20 psf or less, otherwise 20 × Is. The design value is the larger. Sloped roof, drift, sliding, and unbalanced loads are applied by the engineer on top.
A worked example
Thirty psf of ground snow on a heated, partially exposed, ordinary building gives a flat roof snow load of 21 psf; the low-slope minimum at that ground load is 20, so 21 governs, and a foot and a half of settled snow weighs about that.
The tool's starting values, and what it returns for them:
| Ground snow load | 30 psf |
| Exposure | Partially exposed, typical (Ce 1.0) |
| Thermal condition | Heated building (Ct 1.0) |
| Risk category | II, most buildings (Is 1.0) |
| Building width (for the drawing) | 80 ft |
| Eave height | 20 ft |
| Roof pitch | 1 :12 |
| Flat roof snow load | 21 psf |
| Low-slope minimum | 20 psf |
| Design roof snow load | 21 psf |
| Snow depth that weighs this much | 1.4 ft |
- Under 3:12 the low-slope minimum governs where it is larger, and drifts against parapets, equipment, and taller walls add to it; the building's engineer applies those.
Mistakes that catch people
- Taking the ground snow from a neighboring county or a national average.
- A thermal factor of 1.0 for a building that will be unheated or a freezer.
- Forgetting drift on the low roof of an addition next to the existing building.
Rules of thumb
- Flat roof snow = 0.7 × Ce × Ct × Is × ground snow.
- Unheated building: Ct 1.2, 20% more snow. Freezer: 1.3.
- Settled snow weighs about 15 pounds per cubic foot; a foot of it is 15 psf.
When to stop calculating and make a call
- Every building: the engineer of record applies drift, sliding, and unbalanced loads; this is the check on the quote.
- Adding rooftop equipment or a higher building next door: the drift load changes and the existing roof may need a look.
Questions people ask
- Where do I find the ground snow load?
- The ASCE 7 snow map (Figure 7.2-1) or the ASCE Hazard Tool by address, and the local building department, which may set a higher value in snow country. The building quote should state the ground snow load it was designed for.
- Why is the roof load less than the ground load?
- Wind blows snow off a roof and heat from below melts some of it, which the 0.7 factor and the exposure and thermal factors account for. An unheated, sheltered building gets most of the ground load; a cold storage roof gets more than the ground load.
Standards and sources
- ASCE 7-16, Chapter 7, Snow Loads (7.3, 7.3.4, Tables 7.3-1 to 7.3-3)
- MBMA Metal Building Systems Manual, Section 1 (loads)
This guide and the tool are planning aids. The equipment maker, the engineer of record, the accountant, or the code official confirms the final number for your building.