Line Item SupplyIndustrial Equipment
Request a Quote

Metal buildings and structure · guide

Roof pitch converter: the guide

Pitch, degrees, percent, and the slope multiplier are the same slope four ways, and the multiplier is what turns a run into a rafter or a panel length.

Open the calculator

Why this number matters

North American roofs are described as rise per 12 of run: 1:12 for a metal building, 4:12 for a house, 12:12 for 45 degrees. Engineers use degrees, civil drawings use percent, and the estimator needs the multiplier, the hypotenuse of the 12-and-rise triangle over 12, that stretches a horizontal run into a length along the slope. A 4:12 roof is 18.4 degrees, 33%, and 1.054 times its run; a 1:12 roof is 4.8 degrees, 8.3%, and 1.0035.

The conversion is where sheeting and endwall take-offs start: half the building width times the multiplier is the roof panel length before overhang, and the rise over the half width is what the endwall panels step up to. The related calculators do those jobs; this one answers the question that comes up in between.

How it is figured

  • Angle = arctan(rise ÷ 12). Percent = rise ÷ 12 × 100. Slope multiplier = √(12² + rise²) ÷ 12; rafter length = run × multiplier.

A worked example

A 4:12 pitch is 18.43 degrees and a 33.3% slope; over a 20-foot run the rafter is 21.08 feet and the rise is 6.67 feet.

The tool's starting values, and what it returns for them:

Rise per 12 of run1 :12
Horizontal run40 ft
Angle4.76 °
Slope8.33 %
Rafter or panel length40.14 ft
Slope multiplier1.0035
Total rise over the run3.33 ft

Mistakes that catch people

  • Reading 4:12 as 4 degrees or as 4%.
  • Measuring the run along the slope and multiplying again.
  • Using the multiplier on the ridge-to-eave rise instead of the run.

Rules of thumb

  • 1:12 ≈ 4.8°, 2:12 ≈ 9.5°, 4:12 ≈ 18.4°, 6:12 ≈ 26.6°, 12:12 = 45°.
  • Multiplier: 1:12 1.0035, 4:12 1.054, 6:12 1.118, 12:12 1.414.
  • Percent = rise ÷ 12 × 100.

When to stop calculating and make a call

  • Pitch changes on an existing roof: drainage, snow, and the roof panel's minimum slope (1/4:12 for standing seam, 3:12 for exposed fastener) are the maker's limits.

Questions people ask

What pitch do metal buildings use?
Most pre-engineered buildings are 1:12 (about 4.8°) or 0.5:12; 4:12 is common where the look matters or snow sheds. The sheeting calculator uses the same multiplier for roof panel lengths.

Standards and sources

  • Trigonometry

This guide and the tool are planning aids. The equipment maker, the engineer of record, the accountant, or the code official confirms the final number for your building.