Offices, people, and code · guide
Office circuits and panel: the guide
An office's panel is a receptacle count, a lighting load, the HVAC, and a few dedicated circuits, sized by the Code's VA rules and fed by one feeder from the plant.
Why this number matters
The National Electrical Code counts each receptacle outlet at 180 volt-amperes for load purposes and lets a 20-amp circuit carry 1,920 VA of them at 80%, which works out to about ten receptacles a circuit; lighting is its watts at 125% as a continuous load; the HVAC unit's nameplate sets its own two-pole breaker; and a copier, a refrigerator, a microwave, and a server rack each want a dedicated circuit. The total VA over the feeder voltage, with the square root of three for three phase, is the feeder amps, and at 125% rounded up is the feeder breaker.
A subpanel in the office is almost always the right design: one feeder from the plant panel, a panel with 30% spare spaces, and the office can be moved later with its wiring intact. Modular office makers ship them pre-wired with the panel and the raceway in the panels, which is most of the electrical cost.
Lighting at 277 volts on a 480-volt feeder saves a transformer where the plant is 480; receptacles still need 120, which means a small transformer in the office or a 208-volt feeder.
How it is figured
- Receptacles at 180 VA each (NEC 220.14(I)) on 20 A circuits loaded to 80% (1,920 VA); lighting at 125% continuous; HVAC at about 1,200 VA per ton plus electric heat, at 125%; dedicated equipment at 1,500 VA each.
- Feeder amps = total VA ÷ (volts × 1.732 for three phase); breaker at 125% rounded up to a standard size. Panel spaces with about 30% spare.
A worked example
Sixteen receptacles, 600 watts of lighting, a 2-ton unit with 5 kW of heat, and two dedicated circuits come to about 10,800 VA; on a 120/208 three-phase feeder that is 30 amps, a 40-amp feeder breaker, five 20-amp circuits, and an 18-space panel.
The tool's starting values, and what it returns for them:
| Receptacles | 16 |
| Lighting | 600 W |
| HVAC | 2 tons |
| Electric heat | 5 kW |
| Dedicated equipment circuits | 2 |
| Feeder | 120/208 V three phase |
| 20 A circuits | 5 |
| Feeder breaker | 60 A |
| Subpanel | 12-space, 100 A |
| Connected load | 15,880 VA |
| HVAC and heat | 7,400 VA |
Mistakes that catch people
- Fifteen receptacles on one circuit because the load calculation said it would fit; ten is the practical limit.
- Forgetting the electric heat, which doubles the HVAC circuit.
- Feeding the office from a plant panel that has no spare capacity.
Rules of thumb
- 180 VA per receptacle, about 10 per 20-amp circuit.
- Dedicated circuits: copier, refrigerator, microwave, coffee, server.
- Feeder at 125% of the calculated load; panel with 30% spare spaces.
When to stop calculating and make a call
- The plant's service capacity: a licensed electrician's load calculation on the existing panels.
- Anything with a listed maximum overcurrent device on the nameplate.
Questions people ask
- Do I need a subpanel in the office?
- Almost always: one feeder from the plant panel to a subpanel in the office is cheaper and neater than a dozen home runs, and the office can be moved with its panel. Modular office makers ship them pre-wired with the panel in place.
Standards and sources
- NEC 2020 Article 220 (branch circuit and feeder calculations), 210.11, 210.20
This guide and the tool are planning aids. The equipment maker, the engineer of record, the accountant, or the code official confirms the final number for your building.