Cold storage and condensation
Cold room refrigeration load, quick method
Room size, insulation, temperatures, product throughput, people, lights, and fans in; the load by part and the compressor capacity to ask for, in BTU/h and tons.
Read the guide: what the number means and how to use it
- Transmission: envelope area × temperature difference ÷ R-value, for 24 hours. Walls and ceiling at the surrounding temperature; the floor is taken at the same difference, which is conservative over a heated or ventilated slab.
- Product: pounds per day × specific heat × temperature drop. People at 1,300 BTU/h each below freezing and 1,000 above, 8 hours; lights 12 hours at 3.412 BTU per watt-hour; fan motors 2,545 BTU per hp-hour, 24 hours.
Need it quoted?
Seals, shelters, high-speed and cold storage doors, and vestibules priced as line items with freight to your dock.
Dock seals and doorsCold room refrigeration load
Compressor capacity to ask for
6.1 tons
73,769 BTU/h at 18 h run time
Total load per day
1,327,835 BTU
with a 10% safety factor
- Walls, roof, and floor
- 0.97 tons4,360 sq ft of envelope at 85°F
- Product pull-down
- 0.35 tons
- People
- 0.07 tons
- Lights
- 0.17 tons
- Evaporator fans
- 0.64 tons
- Door infiltration
- 2 tons
One line for the file or the vendor
40x30x14 ft room, R-32, 0°F in 85°F; 20,000 lb/day product, 2 people, 3 hp fans, 2 tons infiltration: 6.1 tons at 18 h/day.
How it is figured
- Transmission: envelope area × temperature difference ÷ R-value, for 24 hours. Walls and ceiling at the surrounding temperature; the floor is taken at the same difference, which is conservative over a heated or ventilated slab.
- Product: pounds per day × specific heat × temperature drop. People at 1,300 BTU/h each below freezing and 1,000 above, 8 hours; lights 12 hours at 3.412 BTU per watt-hour; fan motors 2,545 BTU per hp-hour, 24 hours.
- Infiltration from the door calculator, 10% added, and the day's BTU spread over the compressor run hours to give the capacity.
What to gather
- 1. Inside dimensions of the room and the panel thickness (4 in. urethane is about R-32).
- 2. Pounds of product received on the busiest day and its entering temperature from the receiving log.
- 3. Evaporator fan motor nameplate horsepower and the lighting wattage, from the drawings or the fixtures.
Tools: tape, the receiving log, the equipment nameplates
Sources: ASHRAE Handbook, Refrigeration, Refrigerated-Facility Loads; Heatcraft / Bohn engineering load calculation method (quick method, 18 h run time). A planning calculator; the maker, the engineer of record, or the code official confirms the final number.
Questions people ask
- Why 18 hours of run time?
- Freezer evaporators need defrost cycles, so the compressor is sized to carry the whole day's load in 16 to 18 hours. Coolers above freezing can use 20; the field defaults to 18 for a freezer.
- Is this enough to buy a system?
- It is enough to budget one and to check a contractor's proposal. The contractor's load sheet will add freezing (latent) load for product that arrives unfrozen, respiration for produce, forklift heat, and the real floor construction, then select the evaporators and condensing unit.
- What dominates the load?
- In a busy distribution freezer, door infiltration and product pull-down; in a holding room, transmission through the panels. The breakdown shows which lever matters for your room.
Related calculators: Cold room door infiltration load, Cold dock door condensation. All calculators.