Cold storage and condensation · guide
Cold room refrigeration load: the guide
A cold room's load is the sum of five things, and which one dominates tells you whether to spend on insulation, on the door, or on the product schedule.
Why this number matters
Heat gets into a cold room through the panels, in with the product, from the people and the lights, off the evaporator fan motors, and through the door. The quick method the refrigeration makers publish adds them up over a day: envelope area times the temperature difference divided by the panel R-value, product pounds times specific heat times the pull-down, fixed figures for people and lights and fans, and the door infiltration from its own calculation. A safety factor covers what was missed, and the day's BTU spread over 16 to 18 hours of compressor run time, the rest being defrost, gives the capacity to ask for.
The breakdown is the useful part. A holding freezer with a tight vestibule is mostly transmission, and thicker panels pay. A distribution freezer with thirty door openings an hour is mostly infiltration, and the fast door pays. A blast cell is all product. The calculator shows each term in tons so the money goes to the right one.
Product that arrives above freezing and leaves frozen has a latent load that this quick method does not carry, roughly 100 to 140 BTU per pound for foods, and the refrigeration contractor's load sheet includes it along with respiration for produce and the real floor construction. Use the quick figure to budget, to compare proposals, and to see what moves the number.
How it is figured
- Transmission: envelope area × temperature difference ÷ R-value, for 24 hours. Walls and ceiling at the surrounding temperature; the floor is taken at the same difference, which is conservative over a heated or ventilated slab.
- Product: pounds per day × specific heat × temperature drop. People at 1,300 BTU/h each below freezing and 1,000 above, 8 hours; lights 12 hours at 3.412 BTU per watt-hour; fan motors 2,545 BTU per hp-hour, 24 hours.
- Infiltration from the door calculator, 10% added, and the day's BTU spread over the compressor run hours to give the capacity.
A worked example
A 40 by 30 by 14 freezer at 0°F in an 85°F warehouse with R-32 panels loses about 1.8 tons through the envelope; 20,000 pounds a day of frozen product pulled down 10°F adds a third of a ton, two people and the lights and 3 hp of fans another ton, and two tons of door infiltration brings the day to about 6 tons of compressor at 18 hours.
The tool's starting values, and what it returns for them:
| Room length, inside | 40 ft |
| Room width, inside | 30 ft |
| Room height, inside | 14 ft |
| Panel R-value | R-32 (4 in. urethane, freezer) |
| Room temperature | 0 °F |
| Temperature around the room | 85 °F |
| Product in per day | 20,000 lb |
| Product temperature drop | 10 °F |
| Product specific heat | 0.5, frozen product |
| People in the room | 2 |
| Lighting | 1 W per sq ft |
| Evaporator fan motors | 3 hp total |
| Door infiltration | 2 tons |
| Compressor run time | 18 h per day |
| Compressor capacity to ask for | 6.1 tons |
| Total load per day | 1,327,835 BTU |
| Walls, roof, and floor | 0.97 tons |
| Product pull-down | 0.35 tons |
| People | 0.07 tons |
| Lights | 0.17 tons |
| Evaporator fans | 0.64 tons |
| Door infiltration | 2 tons |
What to gather
- Inside dimensions of the room and the panel thickness (4 in. urethane is about R-32).
- Pounds of product received on the busiest day and its entering temperature from the receiving log.
- Evaporator fan motor nameplate horsepower and the lighting wattage, from the drawings or the fixtures.
Tools: tape, the receiving log, the equipment nameplates
Mistakes that catch people
- Using the warehouse temperature for the floor: a slab over heated or ventilated ground runs warmer, and a slab over unheated ground freezes and heaves.
- Entering the product's specific heat above freezing for product that arrives frozen (0.9 against 0.5, nearly double).
- Forgetting the fan motors, which run 24 hours and put every watt into the room.
Rules of thumb
- 4 inches of urethane panel is about R-32; 5 inches R-40; 6 inches R-48.
- People: 1,300 BTU/h each in a freezer. Fan motors: 2,545 BTU per hp-hour.
- Freezer compressors are sized on 16 to 18 hours of run time a day.
When to stop calculating and make a call
- Buying a system: the contractor's load calculation with latent, respiration, and the real envelope governs.
- The room will blast-freeze or hold produce: those are specialized loads.
Questions people ask
- Why 18 hours of run time?
- Freezer evaporators need defrost cycles, so the compressor is sized to carry the whole day's load in 16 to 18 hours. Coolers above freezing can use 20; the field defaults to 18 for a freezer.
- Is this enough to buy a system?
- It is enough to budget one and to check a contractor's proposal. The contractor's load sheet will add freezing (latent) load for product that arrives unfrozen, respiration for produce, forklift heat, and the real floor construction, then select the evaporators and condensing unit.
- What dominates the load?
- In a busy distribution freezer, door infiltration and product pull-down; in a holding room, transmission through the panels. The breakdown shows which lever matters for your room.
Standards and sources
- ASHRAE Handbook, Refrigeration, Refrigerated-Facility Loads
- Heatcraft / Bohn engineering load calculation method (quick method, 18 h run time)
This guide and the tool are planning aids. The equipment maker, the engineer of record, the accountant, or the code official confirms the final number for your building.