Standby generator size for a building

Running load, the largest motor, and the voltage in; the kW and kVA the generator needs to carry the load and start that motor, and the next standard set.

Read the guide: what the number means and how to use it

  • Running kW = other loads + the largest motor at 0.746 kW per hp over 90% efficiency, plus the margin.
  • Starting kVA = horsepower × a starter factor: about 6 kVA per hp across the line (NEMA code letter G), 3.5 with a soft starter, 1.5 on a VFD. The set must carry the running loads and that start at once.

Need it quoted?

Modular offices and equipment arrive pre-wired; tell us the service and the panel schedule comes with the quote.

Request a quote

Generator sizing

running kW126 kWneeded kW219 kWset kW250 kW

Generator set

250 kW

313 kVA at 0.8 PF

kW needed

219 kW

running load with margin, or the start

Starting kVA of the motor

180 kVA

Running load with margin
126 kW
Running kVA
148 kVA

One line for the file or the vendor

Running 80 kW + 30 hp motor (6 kVA/hp start), PF 0.85, 20% margin: 219 kW needed, 250 kW set.

Keep this result, or have it priced

One email with what you asked for. No list, no newsletter.

How it is figured

  • Running kW = other loads + the largest motor at 0.746 kW per hp over 90% efficiency, plus the margin.
  • Starting kVA = horsepower × a starter factor: about 6 kVA per hp across the line (NEMA code letter G), 3.5 with a soft starter, 1.5 on a VFD. The set must carry the running loads and that start at once.
  • Generator kW is rated at 0.8 power factor; the set chosen is the next standard rating above the larger of the running kW and the start-limited kW.

Sources: NEMA MG 1, Table 10-5 (locked-rotor kVA per hp by code letter); Generator manufacturer sizing guidance (Cummins, Generac, Kohler): motor starting and voltage dip limits. A planning calculator; the maker, the engineer of record, or the code official confirms the final number.

Questions people ask

Why is the generator bigger than my kW?
Motor starting. A 30 hp motor draws about 180 kVA for a second when it starts across the line, and a generator has to hold voltage through that. The sizing programs the manufacturers run allow a voltage dip, usually 20 to 30%, which this estimate approximates with the starter factor.
Should I include everything?
Only what is on the transfer switch. Many buildings put life safety, the dock, refrigeration, and the office on standby and leave process loads off; the smaller the list, the smaller and cheaper the set.