Standby generator size for a building
Running load, the largest motor, and the voltage in; the kW and kVA the generator needs to carry the load and start that motor, and the next standard set.
Read the guide: what the number means and how to use it
- Running kW = other loads + the largest motor at 0.746 kW per hp over 90% efficiency, plus the margin.
- Starting kVA = horsepower × a starter factor: about 6 kVA per hp across the line (NEMA code letter G), 3.5 with a soft starter, 1.5 on a VFD. The set must carry the running loads and that start at once.
Need it quoted?
Modular offices and equipment arrive pre-wired; tell us the service and the panel schedule comes with the quote.
Request a quoteGenerator sizing
Generator set
250 kW
313 kVA at 0.8 PF
kW needed
219 kW
running load with margin, or the start
Starting kVA of the motor
180 kVA
- Running load with margin
- 126 kW
- Running kVA
- 148 kVA
One line for the file or the vendor
Running 80 kW + 30 hp motor (6 kVA/hp start), PF 0.85, 20% margin: 219 kW needed, 250 kW set.
How it is figured
- Running kW = other loads + the largest motor at 0.746 kW per hp over 90% efficiency, plus the margin.
- Starting kVA = horsepower × a starter factor: about 6 kVA per hp across the line (NEMA code letter G), 3.5 with a soft starter, 1.5 on a VFD. The set must carry the running loads and that start at once.
- Generator kW is rated at 0.8 power factor; the set chosen is the next standard rating above the larger of the running kW and the start-limited kW.
Sources: NEMA MG 1, Table 10-5 (locked-rotor kVA per hp by code letter); Generator manufacturer sizing guidance (Cummins, Generac, Kohler): motor starting and voltage dip limits. A planning calculator; the maker, the engineer of record, or the code official confirms the final number.
Questions people ask
- Why is the generator bigger than my kW?
- Motor starting. A 30 hp motor draws about 180 kVA for a second when it starts across the line, and a generator has to hold voltage through that. The sizing programs the manufacturers run allow a voltage dip, usually 20 to 30%, which this estimate approximates with the starter factor.
- Should I include everything?
- Only what is on the transfer switch. Many buildings put life safety, the dock, refrigeration, and the office on standby and leave process loads off; the smaller the list, the smaller and cheaper the set.