Generator sizing: the guide
A standby set is sized by the motors it has to start, not just the load it has to carry; the biggest motor's inrush is usually what sets the frame.
Why this number matters
Running load is straightforward: add the kW of everything on the transfer switch, with a margin. The difficulty is starting. A motor started across the line draws about six times its full-load current for a second, which on a 30 hp motor is roughly 180 kVA, and a generator has to supply that while holding its voltage within the dip the equipment tolerates. The manufacturers' sizing programs handle the details; the estimate here follows them by adding the largest motor's starting kVA to the running load of everything else and sizing the set to carry both.
Soft starters and variable frequency drives cut the starting kVA by half to three quarters, which often drops the generator a frame size, and that is frequently cheaper than the bigger set. Sequencing the loads so the big motors start one at a time does the same thing with the transfer switch controls.
Generators are rated in kW at 0.8 power factor, so a 100 kW set is 125 kVA; the two numbers travel together on the data sheet and both have to clear the calculation.
How it is figured
- Running kW = other loads + the largest motor at 0.746 kW per hp over 90% efficiency, plus the margin.
- Starting kVA = horsepower × a starter factor: about 6 kVA per hp across the line (NEMA code letter G), 3.5 with a soft starter, 1.5 on a VFD. The set must carry the running loads and that start at once.
- Generator kW is rated at 0.8 power factor; the set chosen is the next standard rating above the larger of the running kW and the start-limited kW.
A worked example
Eighty kW of running load plus a 30 hp motor started across the line: the motor runs at about 25 kW and starts at about 180 kVA. The running load with a 20% margin is 126 kW; starting the motor with the rest running needs about 274 kVA, which at 0.8 power factor calls for a 250 kW set, or a 150 kW set if the motor gets a soft starter.
The tool's starting values, and what it returns for them:
| Running load | 80 kW |
| Largest motor | 30 hp |
| Its starter | Across the line (about 6 kVA per hp) |
| Load power factor | 0.85 |
| Margin | 20 % |
| Generator set | 250 kW |
| kW needed | 219 kW |
| Starting kVA of the motor | 180 kVA |
| Running load with margin | 126 kW |
| Running kVA | 148 kVA |
Mistakes that catch people
- Sizing on the running kW and tripping the set the first time the compressor starts.
- Putting every load on the transfer switch; the smaller the list, the smaller the set.
- Forgetting that a generator's kW rating is at 0.8 power factor.
Rules of thumb
- Across-the-line start: about 6 kVA per hp. Soft start: 3.5. VFD: 1.5.
- Carry the running load and the largest motor's start at once.
- Generator kVA = kW ÷ 0.8.
When to stop calculating and make a call
- Any set over 100 kW, or one feeding life safety loads: the manufacturer's sizing program and an engineer's one-line.
- Fuel, exhaust, and sound: the installation is as big a design as the set.
Questions people ask
- Why is the generator bigger than my kW?
- Motor starting. A 30 hp motor draws about 180 kVA for a second when it starts across the line, and a generator has to hold voltage through that. The sizing programs the manufacturers run allow a voltage dip, usually 20 to 30%, which this estimate approximates with the starter factor.
- Should I include everything?
- Only what is on the transfer switch. Many buildings put life safety, the dock, refrigeration, and the office on standby and leave process loads off; the smaller the list, the smaller and cheaper the set.
Standards and sources
- NEMA MG 1, Table 10-5 (locked-rotor kVA per hp by code letter)
- Generator manufacturer sizing guidance (Cummins, Generac, Kohler): motor starting and voltage dip limits
This guide and the tool are planning aids. The equipment maker, the engineer of record, the accountant, or the code official confirms the final number for your building.