Material handling and racking · guide
Pallet rack beam and frame loads: the guide
Rack is rated per beam pair and per frame, and the loads come from the pallets: beam load per level, frame load from the levels stacked on it, and the slab pressure under the base plate.
Why this number matters
A beam pair's rating is the uniformly distributed load it carries at the rated deflection, stamped on the beam or in the maker's table. Two pallets of 2,200 pounds on a 5,000-pound pair is fine; a single 4,000-pound coil in the middle of the span is a point load the same beams may not take. The frame carries the beam loads from every level above the floor, and an interior frame carries half of each bay beside it, which adds up to one full bay; that load lands on two posts and then on the slab through the base plates.
The frame's capacity depends on the column section and the distance from the floor to the first beam, which the RMI tables and the maker's engineering cover; this calculator gives the demand to compare against them. The base plate pressure is what the slab sees: a 13,000-pound frame on 6 by 8 inch plates is about 140 psi, which a 6-inch slab on good base takes, and which starts to need an engineer's look past about 150.
Rack is also the thing that falls over when it is overloaded or hit, so the load plaques the RMI standard requires are posted from these numbers and the forklift-aisle and impact calculators sit next to this one for a reason.
How it is figured
- Beam pair load = pallets per level × the heaviest pallet, compared with the beam pair's rated capacity (uniformly distributed, from the beam stamp or the maker's table).
- Frame load = beam level load × levels for an interior frame (it carries half of each bay beside it, which adds to one bay) and half that for an end frame; each post takes half the frame. Base plate pressure = post load ÷ plate area.
- The frame's own capacity depends on its height to the first beam and the column section (RMI tables); this calculator gives the demand, the maker's table gives the capacity.
A worked example
Two 2,200-pound pallets per level on three levels above the floor put 4,400 pounds on each beam pair, within a 5,000-pound rating, 13,200 pounds on an interior frame, 6,600 on each post, and 138 psi under a 6 by 8 inch base plate.
The tool's starting values, and what it returns for them:
| Pallets per beam level | 2 |
| Heaviest pallet | 2,200 lb |
| Beam levels above the floor | 3 |
| Beam pair rating | 5,000 lb |
| Base plate | 6 x 8 in. (48 sq in) |
| Frame position | Interior frame, bays on both sides |
| Load on each beam pair | 4,400 lb |
| Load on the frame | 13,200 lb |
| Pressure under each base plate | 138 psi |
| Load in one bay above the floor | 13,200 lb |
| Load on each post | 6,600 lb |
- 138 psi under the base plate is high for a plain slab; the rack maker's frame table and a slab check by an engineer are needed before loading.
Mistakes that catch people
- Counting the floor-level pallets in the beam and frame loads; they sit on the slab.
- Treating a concentrated load as uniform.
- Ignoring the first-beam height: raising it to clear a floor pallet derates the frame.
Rules of thumb
- Beam pair load = pallets per level × heaviest pallet, uniform.
- Interior frame = one full bay above the floor; end frame half.
- Base plate pressure over about 150 psi: ask about the slab.
When to stop calculating and make a call
- Any rack over 8 feet of beam, in seismic country, or carrying over 2,500 pounds a pallet: the maker's engineering and a permit.
- A slab of unknown thickness or with cracks at the posts: a slab investigation.
Questions people ask
- What does a beam rating mean?
- The load a pair of beams carries spread evenly along them, per level. Two 2,200 lb pallets on a pair rated 5,000 lb is fine; a 4,000 lb coil sitting in the middle of the beams is a point load and takes a heavier beam even though it is under 5,000.
Standards and sources
- ANSI MH16.1 / RMI, Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks
- Rack manufacturer beam and frame capacity tables
This guide and the tool are planning aids. The equipment maker, the engineer of record, the accountant, or the code official confirms the final number for your building.