Line Item SupplyIndustrial Equipment
Request a Quote

Material handling and racking · guide

Conveyor horsepower: the guide

A belt conveyor's motor is sized from the belt pull, the friction of the load and the belt on the bed plus any lift, times the speed; slider beds need six times the pull of roller beds.

Open the calculator

Why this number matters

The force to move a belt is the weight on it, load plus belt, times a friction factor for what it slides or rolls on, plus the weight lifted on an incline. Rollers have a factor of about 0.05; a slider bed, where the belt drags on a steel plate, about 0.3. Multiply by the belt speed in feet per minute, divide by 33,000, and that is horsepower at the belt; divide by the drive efficiency for the motor, and round up to the standard size.

The friction difference is why a 60-foot slider bed carrying heavy cases wants a 3-horsepower motor where a roller bed runs on a fraction of one. Slider beds are cheaper and quieter and fine for light cases; roller beds for heavy loads and long runs. Inclines add the lift, and past about 20 degrees cases slide on a plain belt and want cleats or a rough top.

The motor's electrical side, the breaker and the wire, follows from the motor calculator, and a VFD on the drive lets the speed match the rate from the throughput calculator.

How it is figured

  • Belt pull = friction + lift. Friction = (live load + belt weight) × length × friction factor for the carrying run plus the belt weight × length × factor for the return run; lift = live load × rise. Horsepower = pull × belt speed ÷ 33,000 ÷ drive efficiency.

A worked example

A 60-foot roller bed at 100 feet per minute carrying 25 pounds per foot with a 1.5-pound belt has a belt pull of 84 pounds, needs 0.3 horsepower at 85% efficiency, and gets a half-horsepower motor; the same conveyor on a slider bed would pull about 500 pounds and need a 2-horsepower motor.

The tool's starting values, and what it returns for them:

Conveyor length60 ft
Belt speed100 fpm
Live load on the belt25 lb per ft
Belt weight1.5 lb per ft
BedRoller bed (friction 0.05)
Rise over the length0 ft
Drive efficiency0.85
Horsepower required0.3
Standard motor0.5 hp
Belt pull84 lb
Load on the belt1,500 lb

Mistakes that catch people

  • Using the roller friction factor on a slider bed.
  • Forgetting the return run of the belt, which also drags.
  • Sizing the motor on the average load when the belt is sometimes full end to end.

Rules of thumb

  • Friction: roller bed 0.05, slider bed 0.3.
  • HP = pull × fpm ÷ 33,000 ÷ efficiency.
  • Over 20 degrees of incline, cleated or rough-top belt.

When to stop calculating and make a call

  • Accumulation, merges, and anything with starts under load: the conveyor maker's selection.
  • Bulk conveyors (grain, aggregate): CEMA's full method with belt tensions and idlers.

Questions people ask

Roller bed or slider bed?
A slider bed drags the belt over a steel plate, six times the friction of rollers, which is why a 60 ft slider bed with heavy cases wants a 3 hp motor where a roller bed runs on 1. Slider beds are cheaper and quieter for light loads.

Standards and sources

  • CEMA, Belt Conveyors for Bulk Materials (basic power equations); unit handling conveyor manufacturer sizing (Hytrol)

This guide and the tool are planning aids. The equipment maker, the engineer of record, the accountant, or the code official confirms the final number for your building.