Line Item SupplyIndustrial Equipment
Request a Quote

Material handling and racking · guide

Conveyor throughput: the guide

A conveyor's rate is its speed divided by the pitch between cases; the gap you need for scanning or sorting is what sets the speed.

Open the calculator

Why this number matters

Cases move down a belt at its speed, and how many pass a point per minute is the speed in inches per minute divided by the case length plus the gap between cases. Zero gap is accumulation; scanners, print-and-apply, and sorters need a set gap, often six inches or more, which costs throughput at a given speed. Turning the rate around gives the speed a target rate needs, and that speed tells you whether one lane is enough.

People work beside a belt comfortably at 60 to 90 feet per minute; pick lines run 60 to 120; sortation 180 to 300; high-speed sorters 400 and up with engineered induction. Past about 300 fpm the merges, the gapping, and the case control become the engineering problem, and a second lane is usually cheaper than a faster one.

The calculator sizes the line and the labor behind it: a 3,600 case per hour belt feeding a pack station tells you how many packers the station needs.

How it is figured

  • Cases per minute = belt speed in inches per minute ÷ (case length + gap). Per hour × 60. Speed for a target = target per minute × pitch.

A worked example

A belt at 120 feet per minute with 18-inch cases and 6-inch gaps moves 60 cases a minute, 3,600 an hour; 2,000 an hour would need only 67 feet per minute at that pitch.

The tool's starting values, and what it returns for them:

Belt speed120 fpm
Case length along the belt18 in
Gap between cases6 in
Target rate2,000 cases per hour
Cases per hour3,600
Cases per minute60
Speed for 2,000 per hour67 fpm
Pitch, case plus gap24 in

Mistakes that catch people

  • Rating the line on case length alone and forgetting the gap the scanner needs.
  • Mixing case lengths: the longest case sets the pitch where gaps are fixed.
  • Running a line faster than the slowest station downstream can take.

Rules of thumb

  • Cases per minute = fpm × 12 ÷ (case length + gap).
  • 60 to 90 fpm beside people; 180 to 300 for sortation.
  • Over 300 fpm, add a lane.

When to stop calculating and make a call

  • Merges, sorters, and induction: the conveyor integrator's simulation.
  • Mixed case sizes with print-and-apply: the gap control design.

Questions people ask

What is a normal conveyor speed?
Pick and pack lines run 60 to 120 fpm; sortation and shipping 180 to 300; high-speed sorters 400 and up. People work comfortably beside a belt at 60 to 90 fpm.

Standards and sources

  • CEMA, Belt Conveyors for Bulk Materials / unit handling conveyor practice

This guide and the tool are planning aids. The equipment maker, the engineer of record, the accountant, or the code official confirms the final number for your building.