Efficiency and labor
Takt time, cycle time, and stations needed
Customer demand and the time available in; the takt time the line must hit, how it compares with the cycle time, and the stations or people needed to keep up.
Read the guide: what the number means and how to use it
- Takt time = available production time ÷ customer demand. Stations = cycle time ÷ (takt × uptime), rounded up. Capacity = available time × uptime ÷ the work per station.
Need it quoted?
See what the first-year deduction does to the payback on the same purchase.
Section 179Takt time and stations
Takt time
1.09 min per unit
65 seconds
Stations or people needed
4
cycle 3.2 min ÷ takt at 90% uptime
Capacity with that many
489 units per day
122% of demand
- Available time
- 435 min per day
- Work per station
- 0.8 min74% of takt
One line for the file or the vendor
400/day over 435 available min: takt 1.09 min (65 s); cycle 3.2 min at 90% uptime needs 4 stations, capacity 489/day.
How it is figured
- Takt time = available production time ÷ customer demand. Stations = cycle time ÷ (takt × uptime), rounded up. Capacity = available time × uptime ÷ the work per station.
Sources: Rother and Harris, Creating Continuous Flow (Lean Enterprise Institute). A planning calculator; the maker, the engineer of record, or the code official confirms the final number.
Questions people ask
- Takt time or cycle time?
- Takt is the pace the customer sets; cycle time is how long the work takes. If the cycle is longer than takt you need more stations or less work per unit; if it is much shorter you are overstaffed. The two should sit within about 10% of each other on a balanced line.
Related calculators: OEE calculator, Labor productivity, Conveyor throughput. All calculators.