Takt time, cycle time, and stations needed

Customer demand and the time available in; the takt time the line must hit, how it compares with the cycle time, and the stations or people needed to keep up.

Read the guide: what the number means and how to use it

  • Takt time = available production time ÷ customer demand. Stations = cycle time ÷ (takt × uptime), rounded up. Capacity = available time × uptime ÷ the work per station.

Need it quoted?

See what the first-year deduction does to the payback on the same purchase.

Section 179

Takt time and stations

0 min10 min1.09 mintakt time

Takt time

1.09 min per unit

65 seconds

Stations or people needed

4

cycle 3.2 min ÷ takt at 90% uptime

Capacity with that many

489 units per day

122% of demand

Available time
435 min per day
Work per station
0.8 min74% of takt

One line for the file or the vendor

400/day over 435 available min: takt 1.09 min (65 s); cycle 3.2 min at 90% uptime needs 4 stations, capacity 489/day.

Keep this result, or have it priced

One email with what you asked for. No list, no newsletter.

How it is figured

  • Takt time = available production time ÷ customer demand. Stations = cycle time ÷ (takt × uptime), rounded up. Capacity = available time × uptime ÷ the work per station.

Sources: Rother and Harris, Creating Continuous Flow (Lean Enterprise Institute). A planning calculator; the maker, the engineer of record, or the code official confirms the final number.

Questions people ask

Takt time or cycle time?
Takt is the pace the customer sets; cycle time is how long the work takes. If the cycle is longer than takt you need more stations or less work per unit; if it is much shorter you are overstaffed. The two should sit within about 10% of each other on a balanced line.