Efficiency and labor

Labor productivity and cost per unit

Units handled, the people and hours it took, and the loaded wage in; units per labor hour, labor cost per unit, the gap to your target, and what closing it is worth.

Read the guide: what the number means and how to use it

  • Units per labor hour = units ÷ (people × hours). Cost per unit = labor hours × loaded wage ÷ units. Hours at target = units ÷ target rate; the difference times the wage times the shifts is what the gap costs a year.

Need it quoted?

See what the first-year deduction does to the payback on the same purchase.

Section 179

Labor productivity

0%130%83%of target

Units per labor hour

66.7

96 labor hours for 6,400 units

Labor cost per unit

0.42 $

Against the target

83 %

17% below

Labor hours per shift at the target rate
16 h2 people's worth
Yearly value of reaching the target
112,000 $
Labor cost per shift
2,688 $

One line for the file or the vendor

6,400 units by 12 x 8 h at $28: 66.7 units/labor hour, $0.42/unit, 83% of the 80 target; reaching it is worth $112,000/yr.

Keep this result, or have it priced

One email with what you asked for. No list, no newsletter.

How it is figured

  • Units per labor hour = units ÷ (people × hours). Cost per unit = labor hours × loaded wage ÷ units. Hours at target = units ÷ target rate; the difference times the wage times the shifts is what the gap costs a year.

Sources: WERC DC Measures (warehouse productivity benchmarks); Industrial engineering time standards practice. A planning calculator; the maker, the engineer of record, or the code official confirms the final number.

Questions people ask

What is a normal pick rate?
It depends entirely on the work: 60 to 100 cases an hour for case picking from pallet rack, 150 to 250 lines an hour for each-picking in a good pick module, 20 to 30 pallets an hour on a forklift between dock and rack. Your own best shift is the honest target until an engineer sets a standard.

Related calculators: OEE calculator, Forklift fleet size, Takt time and stations. All calculators.