Efficiency and labor
Labor productivity and cost per unit
Units handled, the people and hours it took, and the loaded wage in; units per labor hour, labor cost per unit, the gap to your target, and what closing it is worth.
Read the guide: what the number means and how to use it
- Units per labor hour = units ÷ (people × hours). Cost per unit = labor hours × loaded wage ÷ units. Hours at target = units ÷ target rate; the difference times the wage times the shifts is what the gap costs a year.
Need it quoted?
See what the first-year deduction does to the payback on the same purchase.
Section 179Labor productivity
Units per labor hour
66.7
96 labor hours for 6,400 units
Labor cost per unit
0.42 $
Against the target
83 %
17% below
- Labor hours per shift at the target rate
- 16 h2 people's worth
- Yearly value of reaching the target
- 112,000 $
- Labor cost per shift
- 2,688 $
One line for the file or the vendor
6,400 units by 12 x 8 h at $28: 66.7 units/labor hour, $0.42/unit, 83% of the 80 target; reaching it is worth $112,000/yr.
How it is figured
- Units per labor hour = units ÷ (people × hours). Cost per unit = labor hours × loaded wage ÷ units. Hours at target = units ÷ target rate; the difference times the wage times the shifts is what the gap costs a year.
Sources: WERC DC Measures (warehouse productivity benchmarks); Industrial engineering time standards practice. A planning calculator; the maker, the engineer of record, or the code official confirms the final number.
Questions people ask
- What is a normal pick rate?
- It depends entirely on the work: 60 to 100 cases an hour for case picking from pallet rack, 150 to 250 lines an hour for each-picking in a good pick module, 20 to 30 pallets an hour on a forklift between dock and rack. Your own best shift is the honest target until an engineer sets a standard.
Related calculators: OEE calculator, Forklift fleet size, Takt time and stations. All calculators.