How many forklifts a shift needs

Pallet moves per shift, the cycle time, hours, and utilization in; the trucks needed and the moves each one makes.

Read the guide: what the number means and how to use it

  • Truck-minutes of work = moves × cycle time. Available minutes per truck = shift hours × 60 × productive fraction. Trucks = work ÷ available, rounded up, plus spares.

Need it quoted?

Guardrail, bollards, rack protection, and mezzanines priced as line items.

Guardrail and protection

Forklift fleet size

working trucks7with spares8

Trucks to run

8

7 working + 1 spare

Working trucks

7

Moves per truck per shift

86

Truck-hours of work
40 h
Utilization of the working trucks
71 %

One line for the file or the vendor

600 moves x 4 min over 8 h at 0.75 productive: 7 working trucks + 1 spare, 86 moves each.

Keep this result, or have it priced

One email with what you asked for. No list, no newsletter.

How it is figured

  • Truck-minutes of work = moves × cycle time. Available minutes per truck = shift hours × 60 × productive fraction. Trucks = work ÷ available, rounded up, plus spares.

Sources: Warehouse engineering practice (time standards and fleet sizing); MHI. A planning calculator; the maker, the engineer of record, or the code official confirms the final number.

Questions people ask

How do I get the cycle time?
Time 20 or 30 moves of each kind with a stopwatch or pull them from the WMS task timestamps, and weight them by how many of each kind the shift does. Travel distance dominates, which is why slotting fast movers near the dock cuts the fleet.