Loading dock
How many dock doors a building needs
Trucks per day, hours of operation, time at the door, and the peak in; the door positions to build, the doors busy at the peak, and the utilization.
Read the guide: what the number means and how to use it
- Door-hours per day = trucks × minutes at the door ÷ 60. Average doors busy = door-hours ÷ hours of operation; peak doors busy = average × peak factor.
- Positions = peak doors busy ÷ target utilization, rounded up, plus the doors drop trailers occupy. Utilization is what the working doors would actually run at.
Need it quoted?
Send the door count and these numbers and the quotation comes back with the levelers, seals, bumpers, and restraints as line items.
Dock equipmentDock doors needed
Dock positions to build
10
8 working doors + 2 for drop trailers
Doors busy at the peak
6.2
4.8 on average
Utilization of the working doors
60 %
- Door-hours per day
- 48
- Trucks per working door per day
- 6
One line for the file or the vendor
48 trucks/day, 60 min at the door, 10 h, peak 1.3, utilization 0.8: 10 dock positions (8 working + 2 drop).
How it is figured
- Door-hours per day = trucks × minutes at the door ÷ 60. Average doors busy = door-hours ÷ hours of operation; peak doors busy = average × peak factor.
- Positions = peak doors busy ÷ target utilization, rounded up, plus the doors drop trailers occupy. Utilization is what the working doors would actually run at.
What to gather
- 1. Count trucks on the five busiest days from the gate log or the WMS appointment list, and take the highest.
- 2. Time at the door: the difference between the check-in and check-out stamps on 20 or 30 loads, averaged.
- 3. Peak factor: the busiest hour's truck count divided by the day's average per hour.
Tools: the gate log or yard management system, the WMS appointment report
Sources: WERC / MHI warehouse planning practice (door-hours method); Kelley / Rite-Hite dock planning guides (peak factors, dwell times). A planning calculator; the maker, the engineer of record, or the code official confirms the final number.
Questions people ask
- How many trucks can one dock door handle a day?
- At 60 minutes a trailer on a 10 hour dock at 80% utilization, about 8. Palletized live loads at 25 minutes push that past 15; floor-loaded containers at 2 hours pull it under 4. The dwell time decides it.
- Should receiving and shipping share doors?
- Small buildings share; above about 10 doors most operations split them so the lifts do not cross, and size each side with its own trucks and dwell.
- What about future growth?
- A door position in a new building is cheap compared with adding one later. Many designers size for the five-year volume, or build the pit and the opening and add the leveler when needed.