Efficiency and labor
OEE: overall equipment effectiveness
Planned time, downtime, ideal cycle time, total count, and rejects in; availability, performance, quality, OEE, and where the lost time went.
Read the guide: what the number means and how to use it
- Availability = run time ÷ planned time. Performance = pieces made ÷ (run time ÷ ideal cycle time). Quality = good pieces ÷ pieces made. OEE = A × P × Q, and fully productive time = planned time × OEE.
- The lost minutes are the six big losses grouped three ways: downtime (breakdowns, setups), speed (reduced speed, minor stops), quality (rejects, startup scrap).
Need it quoted?
See what the first-year deduction does to the payback on the same purchase.
Section 179OEE calculator
OEE
73.5 %
typical, room to gain
Availability
88.5 %
425 of 480 min running
Performance
84.7 %
18,000 of 21,250 possible
- Quality
- 98.1 %17,650 good of 18,000
- Fully productive time
- 353 min
- Lost to downtime
- 55 min
- Lost to slow cycles and minor stops
- 65 min
- Lost to rejects
- 7 min
- Good pieces per planned hour
- 2,206
One line for the file or the vendor
Planned 480 min, down 55, cycle 1.2 s, 18,000 made, 350 rejects: A 88.5% x P 84.7% x Q 98.1% = OEE 73.5%.
How it is figured
- Availability = run time ÷ planned time. Performance = pieces made ÷ (run time ÷ ideal cycle time). Quality = good pieces ÷ pieces made. OEE = A × P × Q, and fully productive time = planned time × OEE.
- The lost minutes are the six big losses grouped three ways: downtime (breakdowns, setups), speed (reduced speed, minor stops), quality (rejects, startup scrap).
What to record on a shift
- 1. Planned time: the shift minus the breaks you schedule; do not subtract breakdowns, they are the point.
- 2. Downtime: every stop with a reason, from the operator's log or the machine's PLC counter; changeovers count.
- 3. Count and rejects from the counter and the scrap bin; the ideal cycle time from the nameplate or the best hour you have ever run.
Tools: the machine's counters, a downtime log, a stopwatch for the ideal cycle
Sources: Nakajima, Introduction to TPM (the OEE definition and the six big losses); SEMI E10 and OEE Industry Standard (OEE Foundation). A planning calculator; the maker, the engineer of record, or the code official confirms the final number.
Questions people ask
- What is a good OEE?
- 85% is the usual world-class benchmark (90% availability, 95% performance, 99% quality); 60% is typical for a plant that has just started measuring, and 40% is common on the first honest count. The number matters less than the loss breakdown, which tells you whether to fix breakdowns, speed, or scrap first.
- Does OEE work for a dock or a warehouse?
- The same arithmetic applies to a dock door (planned hours, hours with a trailer at the door, trailers per hour against the best rate, loads shipped without error) or a conveyor line. Use the dock door calculator for the door count; use this to see how well the doors you have are used.