Line Item SupplyIndustrial Equipment
Request a Quote

Efficiency and labor

OEE: overall equipment effectiveness

Planned time, downtime, ideal cycle time, total count, and rejects in; availability, performance, quality, OEE, and where the lost time went.

Read the guide: what the number means and how to use it

  • Availability = run time ÷ planned time. Performance = pieces made ÷ (run time ÷ ideal cycle time). Quality = good pieces ÷ pieces made. OEE = A × P × Q, and fully productive time = planned time × OEE.
  • The lost minutes are the six big losses grouped three ways: downtime (breakdowns, setups), speed (reduced speed, minor stops), quality (rejects, startup scrap).

Need it quoted?

See what the first-year deduction does to the payback on the same purchase.

Section 179

OEE calculator

0%100%73.5%OEE

OEE

73.5 %

typical, room to gain

Availability

88.5 %

425 of 480 min running

Performance

84.7 %

18,000 of 21,250 possible

Quality
98.1 %17,650 good of 18,000
Fully productive time
353 min
Lost to downtime
55 min
Lost to slow cycles and minor stops
65 min
Lost to rejects
7 min
Good pieces per planned hour
2,206

One line for the file or the vendor

Planned 480 min, down 55, cycle 1.2 s, 18,000 made, 350 rejects: A 88.5% x P 84.7% x Q 98.1% = OEE 73.5%.

Keep this result, or have it priced

One email with what you asked for. No list, no newsletter.

How it is figured

  • Availability = run time ÷ planned time. Performance = pieces made ÷ (run time ÷ ideal cycle time). Quality = good pieces ÷ pieces made. OEE = A × P × Q, and fully productive time = planned time × OEE.
  • The lost minutes are the six big losses grouped three ways: downtime (breakdowns, setups), speed (reduced speed, minor stops), quality (rejects, startup scrap).

What to record on a shift

  1. 1. Planned time: the shift minus the breaks you schedule; do not subtract breakdowns, they are the point.
  2. 2. Downtime: every stop with a reason, from the operator's log or the machine's PLC counter; changeovers count.
  3. 3. Count and rejects from the counter and the scrap bin; the ideal cycle time from the nameplate or the best hour you have ever run.

Tools: the machine's counters, a downtime log, a stopwatch for the ideal cycle

Sources: Nakajima, Introduction to TPM (the OEE definition and the six big losses); SEMI E10 and OEE Industry Standard (OEE Foundation). A planning calculator; the maker, the engineer of record, or the code official confirms the final number.

Questions people ask

What is a good OEE?
85% is the usual world-class benchmark (90% availability, 95% performance, 99% quality); 60% is typical for a plant that has just started measuring, and 40% is common on the first honest count. The number matters less than the loss breakdown, which tells you whether to fix breakdowns, speed, or scrap first.
Does OEE work for a dock or a warehouse?
The same arithmetic applies to a dock door (planned hours, hours with a trailer at the door, trailers per hour against the best rate, loads shipped without error) or a conveyor line. Use the dock door calculator for the door count; use this to see how well the doors you have are used.

Related calculators: Labor productivity, Takt time and stations, Dock doors needed. All calculators.