Line Item SupplyIndustrial Equipment
Request a Quote

Tracking tool · no account · your data stays in your browser

Maintenance tracker: the PM schedule, the work log, and what is due

List the equipment, give each machine its PM tasks by calendar or by meter, and the dashboard tells you every morning what is overdue, what is due this week, which machines are down, and where the maintenance money went. Mark a task done in one click and it goes in the log with the date and the meter. Export anything to a spreadsheet, print the week's list for the board, and keep a backup file on the shared drive.

Loading your records from this browser…

Read the guide: what the schedule means and how to use it

Get the line card, or have it priced

One email with what you asked for. No list, no newsletter.

How to set it up in an afternoon

  1. 1. Load the example plant on the first screen and look at how a dock and a lift truck fleet are set up: tags, locations, meters, and the PM tasks with their intervals.
  2. 2. Clear it and add your equipment, or download the CSV template, fill it from your fixed-asset list, and import it. Tags like FL-01 and DL-03 make the floor and the list agree.
  3. 3. Add the PM tasks from the manuals: the dealer's hour schedule for lift trucks, quarterly leveler inspections, semi-annual door service, the compressor's hour service, heaters before the season. Put the last-done date and meter in so the first due dates are right.
  4. 4. Every Monday, open the dashboard, print the due list, and work it. Mark tasks done as they finish; log repairs with the hours down and what they cost.
  5. 5. Every Friday, download a backup to the shared drive.

Questions

Where is my data stored?
In your browser on your computer, in local storage under one key. It is not uploaded anywhere. Download a backup file from the Backup tab and keep it on the shared drive; restore it on any computer to continue. Clearing the browser's site data erases it, so back up before you do that.
Can two people use it?
Each browser keeps its own copy, so pass the backup file between them, or keep it on one shared computer in the maintenance office. A multi-user version with sign-in is the next step up; this one is meant to be running in five minutes on a plant that keeps its schedule on a whiteboard today.
How are meter-based PMs handled?
Give the task an interval in hours, cycles, or miles and the meter reading at the last service. Update the equipment's meter when you walk the floor or log work; the tracker shows how much is left and flags the task when it comes due, or when the calendar interval does, whichever is first.
What counts as PM compliance?
The share of PM tasks in the last 90 days that were marked done on or before their due date. It is the one number that tells you whether the schedule is a plan or a wish.
What should be on the PM list for a dock?
Levelers quarterly (hydraulics, lip hinges, grease, pit clean-out), doors twice a year (springs, cables, rollers, tracks, bottom seal), seals and shelters at the same visit, restraints quarterly, bumpers at every leveler visit, lift trucks by the dealer's hour schedule and a documented daily inspection. The example plant on the first screen has the whole set.

Dock equipment service

Levelers, doors, seals, and restraints inspected and serviced on a schedule by factory-trained installers, with the report for your log.

Dock equipment