Power factor correction: the guide

A plant full of motors draws more current than its kW needs; capacitors supply the reactive part locally, cut the current, and often end a utility penalty.

Open the calculator

Why this number matters

Induction motors and transformers draw magnetizing current that does no work but still flows through the wires, the transformer, and the utility's meter. The power factor is the ratio of working kW to the total kVA, and a plant of lightly loaded motors can sit at 0.75. Utilities that bill on kVA or add a penalty below 0.90 or 0.95 charge for the difference; the plant's own transformer and feeders carry it as extra current and heat.

Capacitors supply the reactive kVAR from the plant side, so the current from the utility drops to nearly the working component. The kVAR to add is the kW times the difference of the tangents of the two power factor angles; a switched bank at the service corrects the bill, capacitors at the large motors unload the feeders too. Over-correction to a leading power factor is its own problem, so banks are stepped.

Drives and electronic loads have their own, harmonic, power factor issues that capacitors can make worse by resonance; a power quality survey before a large bank is money well spent.

How it is figured

  • kVAR to add = kW × (tan(arccos PF now) − tan(arccos PF target)).
  • kVA = kW ÷ PF on each side; the difference is capacity released in the transformer and feeders, and current falls in the same ratio.

A worked example

A 200 kW load at 0.78 power factor draws 256 kVA; raising it to 0.95 takes 95 kVAR of capacitors, a 100 kVAR bank, releases 46 kVA of transformer capacity, and cuts the line current 18%.

The tool's starting values, and what it returns for them:

Load200 kW
Power factor now0.78
Target power factor0.95
Capacitors to add94.7 kVAR
kVA released45.9 kVA
Line current reduction17.9 %

Mistakes that catch people

  • Fixed capacitors on a motor with a VFD or a soft starter, against the drive maker's instructions.
  • Correcting to 1.0 and going leading at light load.
  • Adding capacitors to a plant with heavy harmonic loads without a resonance check.

Rules of thumb

  • kVAR = kW × (tan θ1 − tan θ2).
  • From 0.80 to 0.95 takes about 0.42 kVAR per kW.
  • Capacitor banks come in 25 kVAR steps.

When to stop calculating and make a call

  • Any bank over about 100 kVAR, or a plant with drives: a power quality study first.
  • The utility penalty clause: read it; some bill on kVA demand, some on a power factor threshold.

Questions people ask

Is correction worth it?
When the utility bills a power factor penalty or a kVA demand charge, usually yes, with paybacks of one to three years on a plant full of motors. Without a penalty the gain is transformer and feeder capacity and slightly lower losses.
Where do the capacitors go?
Either a switched bank at the service, which fixes the bill, or capacitors at the large motors, which also unload the feeders. Do not fix capacitors on a motor controlled by a VFD or with a soft starter without the manufacturer's say-so.

Standards and sources

  • IEEE Std 141 (Red Book), power factor improvement
  • Eaton / Schneider power factor correction application guides

This guide and the tool are planning aids. The equipment maker, the engineer of record, the accountant, or the code official confirms the final number for your building.