Crane buildings: the crane is designed in, not added on.

An overhead crane is the heaviest and most demanding thing a metal building can carry. It changes the frames, the columns, the bracing, the foundation, and the stiffness the building needs. All of it is routine when the crane is known before the building is engineered.

Cutaway drawing of a clear-span metal building interior with tapered rigid frames and no interior columns

Representative drawing of the equipment type, not the exact configuration quoted.

The crane data to send

The crane supplier provides most of this. If the crane is not selected yet, send the requirements and the building is designed for an agreed set of values.

  • Type: top-running bridge, underhung bridge, monorail, or jib
  • Rated capacity, and how many cranes share a runway
  • Span, hook height, and the clearance needed above the crane
  • Class of service, which describes how hard and how often the crane works
  • Wheel loads, wheel spacing, and bridge and trolley weights
  • Length of the runway and which bays it covers
  • Whether the crane is cab or floor operated, and its travel speeds
Isometric drawing of steel frames, purlins, girts, and cross bracing in a new building

Representative drawing of the equipment type, not the exact configuration quoted.

What changes in the building

Crane loads are vertical, sideways, and along the runway, and they move. Columns are designed to carry the runway, by brackets on the frame columns or by separate crane columns for heavier cranes. Longitudinal bracing is added for the forces when the crane starts and stops. The building is designed to tighter deflection and drift limits so the crane runs true, and the reactions delivered to the foundation increase.

Hook height drives the eave height. Work from the tallest lift, the hook travel, and the depth of the crane and runway up to the roof framing.

Who supplies what

The split varies by project and must be written down. Commonly the crane, its rails, stops, electrification, and controls come from the crane supplier, and the supporting steel comes with the building when the crane is on the building order. The runway beams may come from either. The quotation states exactly which parts are in the building package so the crane supplier's scope can be matched to it.

Questions

Can I plan for a crane now and buy it later?
Yes, and it is a good way to build. The building is designed and priced for a defined future crane, and the supports can be installed now or later. The crane that is eventually bought has to fit within the values the building was designed for.
Can a crane be added to a building that was not designed for one?
Sometimes, most reliably with a free-standing crane system on its own columns and foundations. Supporting a crane on existing building frames requires a structural review and usually reinforcement.
What is a crane class of service?
It is a classification published by the crane industry that describes how frequently and how heavily a crane is used, from infrequent standby service to continuous severe service. The building engineer uses it for fatigue and stiffness requirements.