Planning and budgeting · Plant-wide

What installation costs, by equipment type, and how to get it on the same quotation

Reviewed November 4, 2026. Official sources are linked where they exist.

Short answer

Installation is priced from crew-days, lift equipment, and anchoring, not from the equipment price, but as a planning share it usually lands between 15 and 40 percent of the equipment cost: guardrail and bolt-down items at the low end, mezzanines with stairs and gates and modular offices with electrical at the high end. The number moves with site access, slab condition, working height, whether the plant is running during the install, and union or prevailing-wage rules. On this site you tick "Quote installation too" on the quote form and an installer from our network prices the labor from the same drawings and bill of material, so installation shows up as its own line on the quotation instead of a separate contract you have to find.

How installation is actually priced

An installer prices a job from four things: how many crew-days the drawings add up to, what lift equipment the job needs, what the anchoring and the slab demand, and how far the crew travels. The equipment price is a weak proxy for all four. A long run of guardrail is expensive in steel and cheap to install; a two-story modular office is the opposite. That is why a percentage is only a planning number, and why the installer wants the drawing set before quoting.

When the equipment comes from us, the installer already has the drawings and the bill of material, because the customer got them before the purchase order. That removes the most common cause of a high installation quote: an installer pricing the unknown.

Planning ranges by equipment type

Shares of equipment cost, for budgeting before the drawings exist. Your installed line is quoted from the drawings and your site.

Installation as a share of equipment cost, planning ranges
Warehouse guardrail and bollards10 to 20 percent. Anchor drilling is the work; long straight runs go fast, cut-ups around columns and doors go slow.
Dock levelers (pit style)15 to 30 percent per position, assuming the pit exists. Pit forming and concrete are by others or a separate line.
Dock seals, shelters, bumpers, restraints10 to 25 percent. Restraints need power and a control box; seals and bumpers are an afternoon per door.
Sectional and rolling steel doors20 to 35 percent. Track, springs or operator, and electrical for the operator.
High-speed doors20 to 35 percent, plus electrical to the control box. Factory-trained installers protect the warranty.
Steel mezzanines20 to 35 percent with stairs, gates, and handrail. Decking and anchoring drive the hours; a crane or telehandler is usual above 10 feet.
Modular in-plant offices25 to 40 percent with electrical, ceiling, and HVAC hookup. Fewer, longer wall panels install faster than many short ones.
Pre-engineered metal buildingsQuoted per square foot, not as a share: see the metal building cost guide.

What moves the number

Installers ask these before they price. Answering them up front keeps the quote tight.

  • Site access: dock or grade-level door, forklift on site, distance from the truck to the installation point
  • Slab: thickness and condition for anchoring, any post-tensioned slab or trench that limits drilling
  • Working height and lift equipment: ceiling height, whether a scissor lift fits, crane or telehandler for a mezzanine
  • Plant running or down: working around production and forklift traffic adds days and often a night or weekend premium
  • Electrical and HVAC: who runs power to the office, the door operator, or the restraint control box
  • Union, prevailing wage, and badging: plant rules and public work change the labor rate and the paperwork
  • Travel: distance from the crew's base, and per diem for out-of-town work

Installed versus supply only

Supply only is right when the plant has a maintenance crew that bolts things down, or a general contractor already on site. Guardrail, bollards, dock bumpers, and single-level bolt-together platforms are routinely self-installed. Levelers, restraints, high-speed doors, and anything with a warranty that depends on a trained installer are better quoted installed. Mezzanines with stairs and gates and modular offices fall in between: a capable millwright crew can do them from the drawings, but the schedule and the permit inspection usually favor a crew that has done twenty of them.

On our quote form the choice is a radio button. Supply only gets you equipment and freight to the dock. Quote installation too gets you the same quotation with an installed line from an installer in your area, priced from the drawings. You accept either way, or both, on the same document.

What to send for an installed quotation

The drawings and bill of material come from us. The installer needs the site.

  • Photos of the area, the dock or door you will receive through, and the floor where it goes
  • Slab thickness if you know it, and any slab warnings (post-tensioned, trenches, in-floor heat)
  • Ceiling height and anything overhead: sprinklers, ductwork, conduit, cranes
  • Whether production runs during the install, and the hours a crew can work
  • Electrical: where power is, and whether your electrician or ours makes the final connection
  • Plant rules: union, badging, safety orientation, insurance limits the plant requires

Questions buyers ask

Is installation a separate contract?
No. The installed line is on our quotation and you contract with us. The installer is paid by us, on their terms, and you have one point of contact for the equipment and the install.
Can I use my own installer or contractor?
Yes. Choose supply only and we send the drawings and bill of material your installer needs. Many of our customers' contractors join the installer network afterward.
Does installed pricing include electrical?
The installer's line says what it includes. Final electrical connections are usually by your electrician unless you ask for them, because most plants have one and most jurisdictions require a licensed one.
How is a mezzanine install different from an office install?
A mezzanine is a steel erection job: columns, beams, decking, stairs, and anchoring, usually with a lift or crane. A modular office is a panel assembly job with a ceiling grid, lighting, and HVAC, usually from a scissor lift or ladders. Different crews, different equipment, both from the same drawings.
Who installs the equipment I buy from you?
An installation contractor in our network near your plant, chosen by trade and area. Installers apply with their trades, coverage, crews, insurance, and rates, and the owner reviews every application.