Modular Offices
In-Plant Offices
An in-plant office is a free-standing room built from pre-finished panels on a post frame, with a roof deck, a steel door, windows, and an electrical package. Plants use it as a supervisor office, a quality lab, a shipping and receiving office, a production control room, or a break room; the use decides the wall system, the glazing, and the services.
What we quote
How to specify in-plant offices
The building goes together on your slab in days: panels lock into posts, the roof deck bolts on, and the pre-hung door and windows drop into framed openings. Wall panels come with a vinyl-covered gypsum face for the quietest room, a painted steel exterior where forklifts pass, or a fire-rated core where the code or the insurer asks for it. A suspended acoustical ceiling and pre-wired lighting and outlets are standard.
The two numbers that decide the building are the footprint and the clear ceiling height where it sits. Eight-foot walls need roughly nine feet to the lowest obstruction for the roof deck and clearance. HVAC is a through-wall unit or a mini-split sized to the room; a plant electrician usually makes the final connection to a single point.
Before you ask for a quote, know:
- What the room is for and how many people work in it; then the footprint (length x width) that fits the spot
- Clear ceiling height at the location, measured to the lowest duct, joist, or sprinkler main
- Slab or mezzanine; if mezzanine, the deck load rating
- How many existing building walls the room uses (4-wall free-standing, or a corner)
- Wall system, doors, windows, HVAC, and whether you want installation quoted
Questions buyers ask
- How long does an in-plant office take to install?
- A standard single-room building is typically installed in one to three days by a two-person crew once the panels are on site. Larger and multi-room buildings take longer. Installation can be quoted or done by your maintenance team with the factory instructions.
- Can I move it later?
- Yes. The panels and posts are demountable. Relocation is a common request when a line changes, and the building is usually treated as equipment rather than construction for depreciation.
- What ceiling height do I need?
- About nine feet to the lowest obstruction for 8' walls, more for 9' or 10' walls. The builder checks this for you as you enter the numbers.
Related guides
Work it out
Free calculators for the numbers this decision turns on, each with a guide to the method.