Short answer
Pharmaceutical and medical device facilities buy modular cleanrooms to the ISO 14644-1 class the process requires, usually ISO 7 for device assembly and ISO 8 for packaging, with gowning rooms and interlocked airlocks, pass-through chambers for material, cGMP-compatible modular rooms for QC labs and secondary packaging, caged and controlled storage for quarantine, released, and rejected material, cleanroom benches and seating, and outside the clean zone the dock, the guardrail, and the warehouse mezzanine any plant needs. The user requirement specification and the quality system drive the design; we return drawings and a rendering before the order so the room can be reviewed under change control, and installation can be on the same quotation.
What this facility buys from us
- Modular cleanroom to class
Hardwall panels, a ceiling grid with fan filter units and lighting, pressure cascade, and the finishes the cleaning agents allow.
- Gowning rooms and airlocks
The gowning sequence as rooms, with interlocked doors, benches, and lockers, stepping pressure down to the plant.
- QC labs and packaging rooms
cGMP-compatible modular rooms with cleanable surfaces, controlled access, and their own HVAC.
- Quarantine and controlled storage cages
Wire partition cages with locked, labeled zones for quarantine, released, and rejected material.
- Cleanroom furniture
Stainless and laminate benches, cleanroom chairs, and storage that wipe down and do not shed.
- Dock and warehouse outside the clean zone
Sealed dock positions and guardrail for the warehouse that feeds the clean areas.
The user requirement is the drawing brief
The quality system starts a room with a user requirement specification: the class, the pressure, the temperature and humidity range, the material and personnel flows, the cleaning agents, and the monitoring. We take that document and the floor plan and return a layout with the pressure cascade, the gowning sequence, the pass-throughs, and the equipment positions, then the drawings. The room is reviewed and approved under the plant's change control before it is ordered, and the drawings become part of the qualification package.
Class, pressure, and flow
Device assembly is usually ISO 7; secondary packaging is usually ISO 8; sterile filling is a different design with grade requirements beyond a plant-floor modular room. Pressure cascades from the cleanest room outward through the gowning room and the airlock. People and material enter by different routes: people through gowning and an interlocked airlock, material through pass-through chambers or a material airlock. The cleanroom guide covers the classes and the numbers.
- Fan filter unit coverage and air changes from the class and the room volume
- Differential pressure monitoring at each boundary
- Interlocked doors on the airlocks and the pass-throughs
- Finishes compatible with the cleaning and disinfection agents in the SOPs
- Lighting, power, and data in the panels and the grid, and a place for the environmental monitoring sensors
Controlled storage
Quarantine, released, and rejected material have to be physically separated and access controlled. Wire partition cages with locked doors and labeled zones do that in the warehouse; a modular room with controlled access does it for sampling and for controlled substances. The tool crib guide covers partition sizes and doors.
Rooms with a finish specification
QC labs, packaging rooms, and sampling booths are modular rooms with cleanable wall and ceiling panels, sealed joints, coved bases where required, and their own HVAC. They can be rated for fire where the plan requires it. Because they are equipment, they move when the process does, and the change control documents the move.
Standards and rules
The class standard, the cGMP rules, and the plant floor rules.
- ISO 14644-1 classification and 14644-2 monitoring
- 21 CFR Parts 210 and 211 for drug cGMP; 21 CFR Part 820 (the Quality Management System Regulation) for devices
- The facility's validation master plan and change control, which govern how a room is specified, installed, and qualified
- OSHA 1910 Subpart D and 1910.178 for the warehouse and the dock
- Local building and fire codes for the room as a structure
What to send
The user requirement and the floor plan.
- The URS, or the class, pressure, temperature and humidity, and the flows if there is no URS yet
- Floor plan with the location, the clear height, and the obstructions
- Head count inside and the gowning level
- Material flow and the pass-through sizes
- Cleaning agents in use, for the finish selection
- Whether the HVAC ties into the plant or stands alone
Questions buyers ask
- Can a modular cleanroom be qualified under cGMP?
- Yes. It is built to the specification, balanced, and tested; installation and operational qualification are performed against the drawings and the URS by the plant's validation team or a third party. The drawings are part of the package.
- What class does device assembly need?
- ISO 7 is common for assembly of devices that are later sterilized; ISO 8 for secondary packaging. The product's risk assessment decides; send the URS or the product and we propose.
- Do you provide pass-through chambers?
- Yes. Pass-through chambers with interlocked doors, sized to the trays and totes, set in the cleanroom wall.
- Can quarantine storage be a modular room instead of a cage?
- Either. A cage separates and controls access in the warehouse; a modular room adds environmental control for sampling and for controlled substances.
- Can installation be on the quotation?
- Yes. Tick "Quote installation too" and a cleanroom-experienced installer from our network prices the assembly and the ceiling grid from the same drawings.
Do your own research
Official sources first. We link the rule, not a summary of the rule, wherever one exists.
- ISO 14644-1:2015, Classification of air cleanliness by particle concentration
ISO
The classification standard.
- 21 CFR Part 211, Current Good Manufacturing Practice for Finished Pharmaceuticals
eCFR
Subpart C covers buildings and facilities.
- 29 CFR 1910.178, Powered industrial trucks
OSHA
Warehouse and dock rules outside the clean zone.
Guides for this facility
- Modular cleanroom: what plant buyers need to know about classes, air changes, pressure and construction
- Tool Cribs and Parts Cages: Wire Partition Sizes, Doors, and What to Put Inside
- Building a CMM or inspection room on the plant floor: temperature, vibration, floor and doors
- What Installation Costs for Mezzanines, Modular Offices, Guardrail, and Dock Equipment, and How to Get It Quoted
Work it out
Free calculators for the numbers this decision turns on, each with a guide to the method.