Short answer
A plant that needs a cleanroom buys a modular hardwall or softwall cleanroom built to an ISO 14644-1 class (ISO 7 and ISO 8 are the common plant classes), with fan filter units in a ceiling grid for the air changes, a pressure cascade to the rooms around it, a gowning room and an airlock at the entrance, pass-through chambers for parts, high-speed roll-up doors with tight seals where carts and forklifts enter, cleanroom-compatible benches and chairs, and guardrail outside the walls where the plant's forklifts run. The class, the air changes, the pressure, and the entrance sequence are decided from the process, then the room is drawn on your floor plan and quoted with a 3D rendering and drawings before the order.
What this facility buys from us
- Modular cleanroom to an ISO class
Hardwall panels or a softwall curtain system, a ceiling grid with fan filter units and lighting, sized to the class and the air changes.
- High-speed cleanroom doors and airlocks
Fast cycles and a sealed perimeter so the pressure holds when a cart or forklift passes; interlocked airlock doors for people.
- Gowning rooms and anterooms
The gowning sequence as rooms with benches, lockers, and a pressure step down to the plant.
- Pass-through chambers and windows
Parts in and out without a door opening; windows for supervision without entry.
- Cleanroom-compatible furniture
Stainless and laminate benches, cleanroom chairs, and storage that wipe down and do not shed.
- Guardrail outside the walls
Rated barriers where plant forklifts run past the cleanroom wall and the door columns.
The class decides the room
ISO 14644-1 classes are particle counts per cubic meter at a particle size. ISO 8 is the loosest commonly specified; ISO 7 is the usual plant cleanroom for medical device assembly, electronics, optics, and precision packaging; ISO 5 and tighter are laminar flow spaces that are designed differently. The class drives the air change rate, the filter coverage in the ceiling, the pressure, and the finishes. The cleanroom guide works through the classes and the numbers for a plant buyer.
| ISO 8 | Low particle counts for packaging, kitting, and light assembly; moderate air changes, partial filter ceiling coverage, positive pressure to the plant |
|---|---|
| ISO 7 | Medical device, electronics, optics; higher air changes, more filter coverage, a gowning room and an airlock, pass-throughs for parts |
| ISO 6 and tighter | Higher coverage and air changes, stricter gowning, often a separate HVAC design; a different conversation from a plant-floor modular room |
Air, pressure, and the way in
Fan filter units in the ceiling grid push HEPA-filtered air down; return air leaves through low wall returns or the gap under softwall curtains. The pressure in the room is higher than the plant so air leaks out, not in, and a gowning room sits between them with a pressure step. Every opening is a leak, which is why doors matter: a high-speed roll-up door with a sealed perimeter is open for seconds and closed tight; an interlocked airlock keeps two doors from opening at once; a pass-through chamber moves parts without opening either.
- Fan filter units: count and placement from the class and the room volume
- Pressure: positive to the plant, stepped down through the gowning room and the airlock
- People: gowning room, interlocked airlock doors, sticky mats, benches on the clean side
- Material: pass-through chambers with interlocked doors, a high-speed door for carts and forklifts
- Monitoring: a differential pressure gauge at the entrance, and particle counting at commissioning
Hardwall or softwall
A hardwall cleanroom is panels on a track with a solid ceiling grid, windows, and doors; it holds pressure, takes a high-speed door, and can be rated for fire. A softwall cleanroom is a frame with clear vinyl curtains and the same ceiling grid; it is cheaper, goes up faster, and suits ISO 8 and some ISO 7 applications where a cart has to pass through the curtain. Most plant cleanrooms for production are hardwall; most for staging and inspection are softwall.
What else goes in and around it
The room is only part of the quotation.
- Gowning room with lockers, a bench, a mirror, and a garment rack
- Pass-through chambers in the wall, sized for the trays or totes
- Cleanroom benches, chairs, and shelving that wipe down and do not shed
- Lighting in the ceiling grid, receptacles and data in the panels, a pressure gauge at the door
- A high-speed door for the material entrance, with the columns protected by bollards or guardrail on the plant side
- Guardrail along the cleanroom wall where forklifts travel, with gaps at the doors
Standards and rules
The class standard plus whatever the product is regulated under.
- ISO 14644-1 for the classification and ISO 14644-2 for monitoring
- FDA current good manufacturing practice (21 CFR 210 and 211 for drugs, Part 820 for devices) where the product is regulated
- The customer's quality system and audit requirements, which usually specify the class and the gowning
- OSHA 1910 Subpart D and 1910.178 for the plant side of the wall
- Local building and fire codes for the room as a structure and for its materials
What to send
The process and the floor plan.
- The ISO class required, or the product and process so we can propose one
- Floor plan with the location marked, the clear height, and the ceiling obstructions
- Head count inside, and the gowning level the quality system requires
- Material flow: what comes in and out, how, and how often
- Power location and whether the room's HVAC ties into the plant or stands alone
- The delivery ZIP code
Questions buyers ask
- What ISO class do I need?
- It comes from the product and the customer's specification. ISO 7 is the common plant class for medical devices and electronics; ISO 8 covers packaging and kitting. The cleanroom guide explains the classes; send the process and we propose one.
- Can a cleanroom have a forklift door?
- Yes. A high-speed roll-up door with a sealed perimeter and an airlock or a vestibule on the plant side keeps the pressure while the forklift passes. The home page example shows it.
- How long does a modular cleanroom take?
- Factory lead time of several weeks for the panels and the grid, then days to a couple of weeks on site depending on size, followed by balancing and particle counting.
- Do you certify the cleanroom?
- The room is built to the class and balanced; certification testing is by a third-party certifier, which we can arrange with the installation.
- Can installation be on the quotation?
- Yes. Tick "Quote installation too" and a cleanroom-experienced installer from our network prices the assembly, the ceiling grid, and the fan filter units from the same drawings.
Do your own research
Official sources first. We link the rule, not a summary of the rule, wherever one exists.
- ISO 14644-1:2015, Cleanrooms and associated controlled environments, Classification of air cleanliness by particle concentration
ISO
The classification standard every cleanroom is specified against.
- 21 CFR Part 211, Current Good Manufacturing Practice for Finished Pharmaceuticals
eCFR
The cGMP rule where the product is a drug.
- 29 CFR 1910.178, Powered industrial trucks
OSHA
The plant side of the cleanroom wall.
Guides for this facility
- Modular cleanroom: what plant buyers need to know about classes, air changes, pressure and construction
- Building a CMM or inspection room on the plant floor: temperature, vibration, floor and doors
- High-speed doors vs rolling steel doors: cycles, speed, security and energy
- What Installation Costs for Mezzanines, Modular Offices, Guardrail, and Dock Equipment, and How to Get It Quoted
Work it out
Free calculators for the numbers this decision turns on, each with a guide to the method.