Reviewed November 4, 2026. Official sources are linked where they exist.
Short answer
We quote selective pallet rack with the load plaques, industrial and rivet shelving for cartons and parts, wire shelving for coolers, freezers, and cleanrooms, cantilever rack for pipe, lumber, and long stock, wire partition cages for controlled storage, storage cabinets including rated cabinets for flammables and batteries, and lockers, together with the rack protection, guardrail, and mezzanines that go with them. Every layout is drawn on your floor plan with the loads, heights, and aisles, and checked against the rack standards and the forklift in use, and the quotation carries freight and installation as its own line when you want it.
What this facility buys from us
- Pallet rack and shelving layouts
Selective rack, shelving, cantilever, and wire shelving, laid out on the plan with loads and heights, quoted by the bay and the level.
- Wire partition cages
Tool cribs, controlled storage, and secure cages with service windows and locked doors.
- Cabinets and lockers
Industrial storage cabinets, rated cabinets for flammables and batteries, and lockers for the workforce.
- Rack and column protection
Upright guards, end-of-aisle protection, and column guards so the rack survives the forklift.
- Storage mezzanines
Shelving and rack on a second floor when the clear height allows it.
- Guardrail
Rated barriers along the walkways beside the storage aisles.
Pick the storage from the load, not the catalog
Each storage type suits a kind of load and a way of picking.
| Selective pallet rack | Pallets, one deep, forklift access to every pallet; the warehouse standard, sized by beam length, beam capacity, and upright height |
|---|---|
| Industrial and rivet shelving | Cartons, bins, and parts picked by hand; steel shelving for heavy parts, rivet shelving for cartons and low cost |
| Wire shelving | Coolers, freezers, cleanrooms, and food areas, where open wire shelves wash down and let air move |
| Cantilever rack | Pipe, lumber, sheet, and anything long, on arms with no front uprights in the way |
| Wire partition cages | Controlled storage: tools, high-value parts, hazmat, quarantine, with locked doors and a service window |
| Cabinets and lockers | Flammable and battery cabinets rated for the contents; industrial cabinets for tools; lockers for the workforce |
| Mezzanine-supported | Shelving or rack on a storage mezzanine when the building has the height and the floor does not |
The rack rules
Pallet rack is a structure. The rack manufacturers' standard sets the design, the load plaque that must be posted, the anchoring, and the inspection; OSHA cites the general duty clause and the materials storage rule when rack is overloaded or damaged; the fire code sets aisle widths and the commodity rules for high-piled storage; and the forklift decides the aisle. A rack layout from us carries the loads and heights on the drawing and the plaques on the quotation, and the rack-hit guide explains what happens when a damaged upright is left in service.
- Load plaques posted on every rack run, per the rack manufacturers' standard
- Anchoring to the slab and a slab that can take it
- Aisle widths from the forklift (counterbalance, reach, narrow-aisle) and the fire code
- High-piled storage permits above the thresholds in the fire code
- Upright protection and end-of-aisle guards where forklifts turn
- Row spacers, wire decking, and pallet supports as the load requires
Shelving that fits the room
Shelving is sized by the shelf load, the item sizes, and the aisle the picker needs. Steel shelving for heavy parts, rivet shelving for cartons, wire shelving where it has to wash down or let air through. A backroom, a parts room, or a supply room is laid out on the plan with the shelving runs, the aisles, and the door swings, so it fits the first time.
Controlled storage
Tools, high-value parts, hazmat, quarantine material, and controlled substances need a locked space with a record of who entered. Wire partition cages with a service window and a locked door, or a modular room with controlled access for environmental control, are the two answers; the tool crib guide covers the sizes and doors, and the hazmat storage guide covers the cabinets and rooms rated for flammables and batteries.
What to send
The floor plan and what goes on the shelves.
- Floor plan with the storage area marked, the clear height, and the column lines
- What is stored: pallet sizes and weights, carton sizes, long stock lengths, or the hazmat list
- The forklift or the picking method, which sets the aisle
- Cooler, freezer, cleanroom, or washdown, which sets the finish
- What has to be locked and who needs access
- The delivery ZIP code
Questions buyers ask
- Do you sell pallet rack?
- Yes. Selective pallet rack laid out on your plan with the loads and heights, the plaques, the anchoring, and the protection, quoted by the bay and the level with freight.
- What shelving goes in a cooler?
- Wire shelving: open shelves that wash down and let the cold air move, with posts and casters rated for the temperature.
- Do I need a permit for pallet rack?
- Often for high-piled storage above the fire code thresholds, and the rack layout is part of the submittal. The quotation carries the drawings the permit office asks for.
- Can you lay out the whole backroom?
- Yes. Send the plan and the list of what is stored, and the layout comes back with the shelving runs, the aisles, and the quotation.
- Can installation be on the quotation?
- Yes. Tick "Quote installation too" and an installer from our network assembles and anchors it. Shelving and small rack runs are routinely self-installed from the drawings.
Do your own research
Official sources first. We link the rule, not a summary of the rule, wherever one exists.
- Rack Manufacturers Institute
MHI
Publisher of the pallet rack design, load plaque, and inspection standards.
- 29 CFR 1910.176, Handling materials, general
OSHA
Secure storage, aisle clearance, and stacking.
- 29 CFR 1910.106, Flammable liquids
OSHA
Cabinets and quantities for flammable storage.
Guides for this facility
- A Forklift Hit My Pallet Rack: Repair or Replace, and How to Stop the Next One
- Tool Cribs and Parts Cages: Wire Partition Sizes, Doors, and What to Put Inside
- Flammable Cabinets, Hazmat Buildings, and Lithium Battery Storage: The Limits That Size Them
- Mezzanine load rating: 125 psf vs 250 psf and how to pick the right one
- Guardrail vs bollards in a warehouse: what actually stops a forklift
Work it out
Free calculators for the numbers this decision turns on, each with a guide to the method.