Egg processing: from the layer house to the cooler without a gap for the flies.

A shell egg plant washes, grades, and packs eggs that must go from the conveyor to a 45 °F cooler and onto a refrigerated trailer without a break. An egg products plant breaks and pasteurizes under USDA inspection. Both are wet, both are cold on one side and warm on the other, and both are audited for pest exclusion and sanitation at every door.

We quote the doors, the rooms, the dock, the air curtains, and the barriers that keep the eggs cold, the flies out, and the inspector satisfied.

Isometric drawing of a high-speed fabric door and an insulated sectional door with bollards

Representative drawing of the equipment type, not the exact configuration quoted.

Reviewed November 4, 2026. Official sources are linked where they exist.

Short answer

Egg processing and packing plants buy washdown-rated high-speed doors between the grading and packing room, the cooler, and the dock, air curtains at the doors from the layer houses and at the dock, hygienic modular rooms for the QA lab, the USDA inspector's office, and the welfare rooms, cooler dock packages with full-seal shelters, vertical-storing levelers, and restraints for refrigerated trailers, galvanized or stainless guardrail for the wet forklift routes, mezzanines over packaging supplies, and HVLS fans in the dry packaging area. FDA shell egg rules, USDA grading and egg products inspection, and the plant's food safety plan set the specification; we quote from the floor plan with drawings and freight and installation on the same quotation when you want it.

What this facility buys from us

The temperature chain

Shell eggs must be held at or below 45 °F ambient after packing under the FDA shell egg rule, and the cooler door is where the chain breaks if it is slow or leaks. A high-speed door in washdown specification between the packing room and the cooler, and a sealed cold dock between the cooler and the trailer, keep the chain closed. The high-speed versus rolling steel guide and the dock seal versus shelter guide cover the choices.

The flies are the audit

An egg plant sits next to layer houses and the pest pressure is constant. Air curtains across the doors from the houses and at the dock, sealed dock positions, strip doors on the openings that cycle, and door sweeps everywhere are the physical half of the pest control program the auditor checks. The air curtain page covers sizing.

Rooms the inspector uses

USDA graders and egg products inspectors need an office with a window onto the floor; the QA lab needs a cleanable room with its own HVAC; the welfare rooms need to be where the people are. Modular rooms with hygienic panels, sealed joints, and coved bases meet the finish rules and go up in days. A 3D rendering comes with the quotation.

Wet floors and forklifts

Washdown floors are slick and the forklifts run the same routes as the people. Galvanized or stainless guardrail with matching anchors, bollards at the equipment and the door jambs, and column guards keep the plant standing; the guardrail rating guide explains the impact numbers.

Rules and programs

FDA, USDA, and OSHA.

  • FDA 21 CFR Part 118 (shell egg production, storage, and transportation) and 21 CFR Part 115 (shell egg refrigeration) for temperature and handling
  • USDA AMS shell egg grading and USDA FSIS egg products inspection, which set facility and inspection office requirements
  • FDA 21 CFR Part 117 for the plant as a food facility
  • OSHA 1910.178 forklifts and 1910.22 for wet floors
  • State heat rules for the packing room in summer

What to send

The floor plan with the temperatures on it.

  • Doors: each opening, size, temperatures on both sides, washdown yes or no, cycles per hour
  • Air curtains: door width and height and the mounting side
  • Rooms: location, size, use, head count, and the finish requirement
  • Dock: positions, trailer types, and the forklift or pallet jack
  • Guardrail: a marked-up plan of the wet routes

Questions buyers ask

What door goes between the packing room and the cooler?
A high-speed door in washdown specification with a heated or sealed frame for the temperature difference and a speed matched to the pallet jack cycles.
Do you build the USDA inspection office?
Yes, as a modular room with a window onto the floor, drawn where the inspection program needs it, with hygienic finishes.
Can an air curtain stop flies at a dock door?
It reduces entry substantially when sized to the opening and mounted correctly; it works with sealed dock positions and door sweeps, not instead of them.
Is stainless guardrail needed?
In the washdown areas, galvanized or stainless with matching anchors; in the dry packaging area, standard guardrail is fine.
Can installation be on the quotation?
Yes. Tick "Quote installation too" and an installer from our network prices the labor with sanitary-zone work practices.

Do your own research

Official sources first. We link the rule, not a summary of the rule, wherever one exists.